Toronto address · Ward 16, Don Valley East
36 Fairhill Cres
The City of Toronto has 5 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision 1. - Proposal to reduce the porch and the addition from 37.05 sq.m to 29.79 sqm.Proposal for interior alterations, rear one storey addition with basement, rear deck, and front porch.
Applied Jan 8, 2020 · issued Feb 11, 2020 · completed Nov 30, 2020 · Permit 17 226584 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposed second floor addition on top of the existing garage
Applied Dec 31, 2019 · issued Jun 30, 2020 · Permit 19 261485 HVA
- Inspections under way
Plumbing
Plumbing - Proposed second floor addition on top of the existing garage
Applied Dec 16, 2019 · issued Jun 30, 2020 · Permit 19 261485 PLB
- Closed
Small residential project · Addition(s)
Proposed second floor addition on top of the existing garage
Applied Dec 16, 2019 · issued Jun 30, 2020 · completed Nov 30, 2020 · Permit 19 261485 BLD
- Closed
Small residential project · Multiple projects
Proposal for interior alterations, rear one storey addition with basement, rear deck, and front porch.
Applied Sep 1, 2017 · issued Sep 22, 2017 · completed Nov 30, 2020 · Permit 17 226584 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second floor addition on top of the existing garage.
Decision: Approved (hearing Mar 5, 2020)
Filed Jan 21, 2020 · File A0036/20NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
26 Lionel Heights Cres · Minor variance
To convert the single family dwelling to a duplex dwelling, with a new front yard porch, a new 2 car garage with 2nd floor addition overtop (remove existing garage), new side entrance and basement walkout.
240 m away · filed Nov 17, 2025 · Approved
26 Lionel Heights Cres · Minor variance
To construct an east and west side addition, a second floor addition over the new 2 car garage, and a front porch, converting the dwelling into a fourplex.
240 m away · filed Apr 30, 2025 · Refused
15 Mission Dr · Minor variance
To construct a ground floor garage, two new platforms and a secondary suite.
190 m away · filed Feb 12, 2025 · Approved
1 Lionel Heights Cres · Minor variance
To construct garage addition, interior alteration, and underpin to an existing dwelling. (The application was deferred at the hearing of 20 June 2024)
150 m away · filed Mar 7, 2024 · Approved
20 Avonwick Gt · Minor variance
Proposal to alter existing second storey and construct a rear one storey addition, front second storey addition and balcony at the rear.
210 m away · filed Aug 9, 2023 · Approved
22 Fairhill Cres · Minor variance
To construct an attached garage to the side of existing dwelling, to replace existing carport.
110 m away · filed Oct 29, 2020 · Approved
9 Lionel Heights Cres · Minor variance
To construct a second floor addition and interior alterations.
210 m away · filed May 29, 2020 · Approved
27 Beveridge Dr · Minor variance
To construct a second floor front and west side addition, in conjunction with a rear deck.
230 m away · filed Dec 31, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.