Toronto address · Ward 5, York South-Weston
36 Haverson Blvd
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve.
Applied Aug 23, 2022 · issued Aug 25, 2022 · completed Aug 29, 2022 · Permit 22 194724 DRN
- Closed
Heating and ventilation
HVAC - Proposed one storey addition with a basement entrance and concrete landing
Applied Jan 11, 2013 · issued Mar 18, 2013 · completed Apr 25, 2022 · Permit 12 205589 HVA
- Closed
Small residential project · Addition(s)
Revision 01 re; Increase gross floor area (10 square feet.)of proposed one storey addition, delete concrete landing and stairs above proposed basement walkout.Proposed one storey addition with a basement entrance and concrete landing
Applied Sep 25, 2012 · issued Oct 9, 2012 · completed Apr 25, 2022 · Permit 12 205589 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposed one storey addition with a basement entrance and concrete landing
Applied Jul 5, 2012 · issued Jul 12, 2012 · completed Apr 25, 2022 · Permit 12 205589 PLB
- Closed
Small residential project · Addition(s)
Proposed one storey addition with a basement entrance and concrete landing
Applied Jul 5, 2012 · issued Jul 12, 2012 · completed Apr 25, 2022 · Permit 12 205589 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
45 storeys · 500 homes · Mixed use
460 m away · Rezoning · Under appeal · filed Mar 4, 2024
Neighbours’ Committee of Adjustment files within 250 m
14 Haverson Blvd · Minor variance
To construct a second storey addition above the existing dwelling.
100 m away · filed Jul 31, 2026 · Approved
68 Haverson Blvd · Minor variance
To legalize and to maintain the new dwelling with a detached garage in the rear yard that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.
90 m away · filed Jun 9, 2023 · Approved
70 Haverson Blvd · Minor variance
To construct a new dwelling.
120 m away · filed Jan 27, 2023 · Approved
68 Haverson Blvd · Minor variance
To legalize and to maintain the new dwelling with a detached rear garage that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.
90 m away · filed Apr 27, 2022 · Refused
76 Haverson Blvd · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Feb 7, 2022 · Approved
47 Harlton Cres · Minor variance
To construct a new detached dwelling with an attached garage.
100 m away · filed Jan 31, 2022 · Approved
18 Harlton Cres · Minor variance
To construct a two-storey front addition, a third floor addition and to create a secondary suite.
110 m away · filed Jan 11, 2022 · Approved
27 Dunraven Dr · Minor variance
To construct a fourth floor rear addition and a detached rear yard deck.
160 m away · filed Apr 28, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.