Toronto address · Ward 5, York South-Weston
36 Robert St
The City of Toronto has 6 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for a second storey addition, new front porch, new rear deck, and interior alterations.
Applied Sep 27, 2022 · issued Sep 29, 2022 · completed Apr 24, 2023 · Permit 21 218909 HVA
- Closed
Plumbing
Plumbing - Proposal for a second storey addition, new front porch, new rear deck, and interior alterations.
Applied Sep 28, 2021 · issued Mar 17, 2022 · completed Apr 17, 2023 · Permit 21 218909 PLB
- Closed
Small residential project · Multiple projects
Proposal for a second storey addition, new front porch, new rear deck, and interior alterations.
Applied Sep 28, 2021 · issued Mar 17, 2022 · completed Apr 24, 2023 · Permit 21 218909 BLD
- Inspections under way
Small residential project · Accessory Building(s)
Proposal to demolish existing detached garage and construct a new detached garage at the rear of the property.
Applied Mar 6, 2018 · issued Sep 14, 2018 · Permit 18 125570 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct interior alterations to basement and ground floor of existing sfd.
Applied Sep 7, 2017 · issued Oct 18, 2017 · Permit 17 228994 PLB
- Inspections under way
Small residential project · Interior alterations
Proposal to construct interior alterations to basement and ground floor of existing sfd.
Applied Sep 7, 2017 · issued Oct 18, 2017 · Permit 17 228994 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
53 storeys · 463 homes · Mixed use
470 m away · Site plan · Under review · filed Sep 21, 2021
Neighbours’ Committee of Adjustment files within 250 m
21 Joseph St · Minor variance
To construct a second and third storey rear addition above a portion of the existing dwelling, a three-storey rear addition, a three-storey east-side addition and two rear platforms.
220 m away · filed Nov 12, 2025 · Approved
20 Portage Ave · Minor variance
To construct a second storey addition above the existing dwelling and a new covered front porch. The existing detached garage in the rear yard will be maintained.
150 m away · filed Sep 20, 2022 · Approved
27 Portage Ave · Minor variance
To construct a new detached dwelling with an attached garage.
200 m away · filed Feb 8, 2022 · Approved
86 Church St · Minor variance
Proposal to add two storey rear addition and rear detached garage
100 m away · filed Jan 27, 2022 · Application withdrawn
7 Ranwood Dr · Minor variance
To construct a second storey addition, two-storey rear and south side additions and a new rear deck.
190 m away · filed Nov 29, 2021 · Approved
77 Church St · Minor variance
To legalize and to maintain the additions to the dwelling.
170 m away · filed Jun 29, 2021 · Approved
37 Lamont Ave · Minor variance
To construct a two-storey east side and rear addition and a second storey addition above the existing dwelling.
70 m away · filed Feb 26, 2020 · Approved
3 Cypress St · Minor variance
To construct a second storey south side platform and a sunroom above the existing garage.
190 m away · filed Nov 26, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.