Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

36 South Bonnington Ave

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Proposal for a rear second storey addition to an existing two storey single family dwelling.

    Applied Mar 30, 2021 · issued Apr 13, 2021 · Permit 21 133816 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for a rear second storey addition to an existing two storey single family dwelling.

    Applied Mar 30, 2021 · issued Apr 28, 2021 · Permit 21 133816 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for a rear second storey addition to an existing two storey single family dwelling.

    Applied Mar 30, 2021 · issued Apr 13, 2021 · Permit 21 133816 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 68 Preston St · Minor variance

    To construct a second storey addition to exsiting dwelling and to construct a two-storey Garden Suite. Cross referrence applicaiton #A0098/23SC.

    160 m away · filed Apr 6, 2023 · Application withdrawn

  • 68 Preston St · Minor variance

    To construct a second story addition to exsiting dwelling and to construct a two-storey Garden Suite. Cross referrence applicaiton #A0090/23SC for Garden Suite materials. NOTE: This Public Hearing Notice is being sent out to correctly identify all variances being requested.

    160 m away · filed Apr 6, 2023 · Approved

  • 82 Preston St · Minor variance

    To demolish existing dwelling and to construct a new two-storey dwelling.

    190 m away · filed Sep 13, 2022 · Approved

  • 17 Malta St · Consent

    To permit a consent to sever the property into two residential lots. Part 1 (Lot to be Retained-East Lot) and Part 2 (Lot to be Conveyed-West Lot) will both have a lot frontages of 6.7 metres and lot areas of 309 square metres and 302.4 square metres respectively. Each lot is to be redeveloped with a new two-storey detached dwelling with finished basement and integral garage. The proposal requires variances to the Zoning By-law. Cross-Reference Minor Variance Applications A0365/21SC and A0366/21SC.

    250 m away · filed Nov 12, 2021 · Approved

  • 17 Malta St · Minor variance

    To permit the construction of a two-storey, detached dwelling. Cross Reference Consent Application B0069SC and A0366/21SC.

    250 m away · filed Nov 9, 2021 · Approved

  • 17 Malta St · Minor variance

    To permit the construction of a two-storey, detached dwelling. Cross Reference Consent Application B0069SC and A0365/21SC.

    250 m away · filed Nov 9, 2021 · Approved

  • 188 South Woodrow Blvd · Minor variance

    To construct a new two-storey detached dwelling.

    120 m away · filed Feb 16, 2021 · Approved

  • 188 South Woodrow Blvd · Consent

    This application is a consent to sever the property into two lots.

    120 m away · filed Feb 16, 2021 · Application withdrawn

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.