Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

36 St Annes Rd

The City of Toronto has 8 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Second suite (New)

    Revision #01 - Changes to interior alterations, structural.Proposed secondary unit addition , interior alterations

    Applied Nov 8, 2023 · issued Nov 17, 2023 · completed Aug 19, 2026 · 1 home added · Permit 23 167600 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed secondary unit addition , interior alterations

    Applied Oct 23, 2023 · issued Dec 18, 2023 · completed Aug 19, 2026 · Permit 23 167600 HVA

    Closed
  • Drains and site services

    Drain - Proposed secondary unit addition , interior alterations

    Applied Jun 29, 2023 · issued Jul 17, 2023 · completed Aug 19, 2026 · Permit 23 167600 DRN

    Closed
  • Plumbing

    Plumbing - Proposed secondary unit addition , interior alterations

    Applied Jun 29, 2023 · issued Aug 21, 2023 · completed Aug 19, 2026 · Permit 23 167600 PLB

    Closed
  • Small residential project · Second suite (New)

    Proposed secondary unit addition , interior alterations

    Applied Jun 29, 2023 · issued Jul 17, 2023 · completed Aug 19, 2026 · 1 home added · Permit 23 167600 BLD

    Closed
  • Plumbing

    Plumbing - Proposed secondary unit addition , interior alterations and rear walk out

    Applied Jun 3, 2023 · completed Jun 22, 2023 · Permit 23 155620 PLB

    Cancelled
  • Drains and site services

    Drain - Proposed secondary unit addition , interior alterations and rear walk out

    Applied Jun 3, 2023 · completed Jun 22, 2023 · Permit 23 155620 DRN

    Cancelled
  • Small residential project · Second suite (New)

    Proposed secondary unit addition , interior alterations and rear walk out

    Applied Jun 3, 2023 · completed Jun 22, 2023 · 1 home added · Permit 23 155620 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 353 Dovercourt Rd · Minor variance

    To construct a new rear one-storey ancillary building (attached garage connecting to the two-storey semi-detached dwelling (houseplex)) with an existing driveway, abutting Churchill Avenue. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first and second levels).

    140 m away · filed Jul 16, 2026 · Tentatively scheduled

  • 61 St Annes Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a complete third storey addition, a new front basement walkout, a new front ground floor covered porch with stairs, a new rear ground floor deck with stairs, and a rear third floor balcony. The existing rear detached garage will be demolished and the existing parking space within will be removed. Also, there will be a secondary suite located within the basement of the dwelling.

    110 m away · filed Jul 10, 2026 · Approved

  • 1330 Dundas St W · Minor variance

    To alter the existing two-storey mixed-use building by converting the second storey residential dwelling unit into an additional eating establishment. There is currently one eating establishment on the ground level, which will be maintained and unaltered.

    210 m away · filed Aug 8, 2025 · Approved

  • 976 College St · Minor variance

    To construct a new six-storey apartment building with a rooftop terrace (a portion to be covered) on the sixth level, and a mechanical penthouse. There will be a total of 19 affordable housing units, and an office space for on-site staff to support tenants. No vehicle parking spaces will be provided on-site. A Site Plan Control application (File Number 20 25 191902 STE 09 SA) is currently under review by City staff.

    220 m away · filed Jul 3, 2025 · Approved

  • 63 Shannon St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing one-storey) with a balcony, a complete third storey addition with a rear balcony, and a rear ground floor deck. Also, there will be a total of two residential dwelling units on this lot (one primary unit, and one secondary suite (located within the basement)).

    210 m away · filed Sep 26, 2024 · Approved

  • 44 Rusholme Rd · Minor variance

    To alter the existing two-and-one-half semi-detached dwelling by constructing a rear one-storey addition with a basement, a rear deck, and a third storey dormer.

    90 m away · filed Aug 14, 2024 · Approved

  • 357 Dovercourt Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, a covered front porch, a rear ground floor addition, a rear second storey deck, side (north) stairs, and a front basement walkout. This dwelling will be a 4-unit multiplex.

    130 m away · filed Jun 9, 2023 · Approved

  • 10 Langemark Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a canopy over the existing front porch, extending past the existing front lot line.

    240 m away · filed Dec 2, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.