Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

361 Ryding Ave

The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Multiple projects

    Revision #3: Enclose rear canopyRevision #2 - Change paint area to spray boothRevision #1: Enlarge rear wall addition to paint area.Proposed construction of a rear yard unenclosed canopy and enlarge existing (1) storey rear yard addition for a new paint area to an existing (1) storey repair garage with body repair.

    Applied Oct 21, 2014 · completed Mar 28, 2021 · Permit 11 330989 BLD (revision 03)

    Cancelled
  • Addition or alteration · Multiple projects

    Revision #2 - Change paint area to spray boothRevision #1: Enlarge rear wall addition to paint area.Proposed construction of a rear yard unenclosed canopy and enlarge existing (1) storey rear yard addition for a new paint area to an existing (1) storey repair garage with body repair.

    Applied Mar 17, 2014 · issued Mar 25, 2014 · Permit 11 330989 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    HVAC - Special ventilation system. Proposed construction of a rear yard unenclosed canopy and enlarge existing (1) storey rear yard addition for a new paint area to an existing (1) storey repair garage with body repair.

    Applied Mar 17, 2014 · issued Apr 1, 2014 · Permit 11 330989 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Revision #1: Enlarge rear wall addition to paint area.Proposed construction of a rear yard unenclosed canopy and enlarge existing (1) storey rear yard addition for a new paint area to an existing (1) storey repair garage with body repair.

    Applied Jun 11, 2012 · issued Jun 29, 2012 · Permit 11 330989 BLD (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Proposed construction of a rear yard unenclosed canopy and enlarge existing (1) storey rear yard addition for a new paint area to an existing (1) storey repair garage with body repair.

    Applied Dec 28, 2011 · issued Mar 20, 2012 · Permit 11 330989 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2451 St Clair Ave W · Minor variance

    To construct a six-storey mixed-use building that will consist of 10 residential units and retail on the ground floor. A previous Committee of Adjustment application (A0323/24EYK) approved variances related to gross floor area, setback for a wall containing a window, buiding height and the number of parking spaces.

    120 m away · filed Feb 12, 2026 · Approved

  • 317 Ryding Ave · Minor variance

    To construct a new multiplex containing 4 dwelling units and to convert the existing garage into a laneway suite.

    120 m away · filed Dec 3, 2025 · Approved

  • 2455 St Clair Ave W · Minor variance

    To construct a new 6-storey mixed use building.

    120 m away · filed Oct 17, 2025 · Approved

  • 2451 St Clair Ave W · Minor variance

    To construct a six-storey mixed-use building that will consist of 10 residential units and retail on the ground floor.

    120 m away · filed Aug 8, 2024 · Approved

  • 266 Ryding Ave · Minor variance

    To construct a semi-detached garage in the rear yard.

    230 m away · filed Jan 17, 2023 · Approved

  • 268 Ryding Ave · Minor variance

    To construct a semi-detached garage in the rear yard.

    220 m away · filed Jan 17, 2023 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.