The City of Toronto has 12 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Proposal for isolated repairs to the suspended slab in the garbage compactor room.

    Applied Jun 18, 2024 · issued Oct 16, 2024 · Permit 24 166747 BLD

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal for interior alterations for new office space on the ground floor of the existing apartment building.

    Applied Jan 5, 2023 · Permit 22 194064 FSU

    Application on hold
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for new office space on the ground floor of the existing apartment building.

    Applied Aug 22, 2022 · issued Feb 13, 2023 · Permit 22 194064 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations for new office space on the ground floor of the existing apartment building.

    Applied Aug 22, 2022 · issued Feb 13, 2023 · Permit 22 194064 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations for new office space on the ground floor of the existing apartment building.

    Applied Aug 22, 2022 · issued Feb 13, 2023 · Permit 22 194064 HVA

    Permit issued
  • Fire and security upgrade · Sprinklers

    Garage dry sprinkler replacement.

    Applied Jan 11, 2022 · issued Jan 19, 2022 · completed Mar 7, 2023 · Permit 22 102654 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install total of 2 maglocks on first floor

    Applied Feb 26, 2018 · issued Mar 15, 2018 · completed Nov 22, 2018 · Permit 18 121768 FSU

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Parking garage waterproofing and localized concrete repairs (Phase 2)

    Applied Jan 27, 2017 · issued Feb 27, 2017 · completed Nov 13, 2018 · Permit 17 110058 BLD

    Closed
  • Designated structure · Sign building permit related

    To erect and display one non illuminated ground sign** Children's services Bay mills**

    Applied Oct 4, 2016 · issued Nov 15, 2016 · completed Jan 16, 2017 · Permit 16 232537 DST

    Closed
  • Plumbing · Fixtures/Roof Drains: other

    Removal of existing water closet, with replacement sink lavatory

    Applied Sep 12, 2016 · issued Oct 4, 2016 · completed Aug 7, 2026 · Permit 16 221027 PSA

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    parking garage localized concrete repairs

    Applied May 10, 2016 · issued Jun 7, 2016 · completed May 2, 2017 · Permit 16 153391 BLD

    Closed
  • Designated structure · Sign building permit related

    In conjunction with a multistorey building, proposal to erect and display two static non-illuminated ground signs on the north and south frontage and one static non-illuminated wall sign on the first storey west elevation. The proposed ground signs are 1.05 metres vertically by 1.72 metres horizontally at a height of 1.71 metres above grade. The proposed wall sign is 0.66 metres vertically by 1.02 metres horizontally.**CHILDREN'S SERVICES BAY MILLS**

    Applied Jan 8, 2016 · issued Feb 18, 2016 · completed Feb 24, 2017 · Permit 16 101728 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 3571 Sheppard Ave E · Minor variance

    Allowance to increase the total interior floor area of eating and take out establishments to 1,103 m². Previous committee of adjustment applications (A244/02SC) approved variances to permit a place of worship and parking supply, (A195/08SC) approved a variance to permit a dry cleaning plant, (A195/14SC) refused variances for parking supply and an increase for total interior floor area for eating establishments and take-out eating establishments, which was appealed to the OMB (Case Number PL141133) and the variances were authorized to permit 107 parking spaces and a proposed interior floor are…

    160 m away · filed Dec 30, 2021 · Approved

  • 3551 Sheppard Ave E · Minor variance

    To permit the proposed interior alterations to the existing plaza for new restaurant.

    140 m away · filed Feb 27, 2021 · Approved

  • 2350 Birchmount Rd · Minor variance

    To construct an enclosure over existing parking garage ramp to shield it from the elements. A previous Committee of Adjustment application (A0255/19SC) approved a variance for side yard setback, however it referenced the wrong performance standard and thus, did not present the correct minimum standard setback.

    90 m away · filed Jun 12, 2020 · Approved

  • 2350 Birchmount Rd · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct an enclosure over existing parking garage ramp to shield it from the elements.

    90 m away · filed Oct 3, 2019 · Approved

  • 30 Amethyst Rd · Minor variance

    To maintain the existing single-storey dwelling on Part 1.

    130 m away · filed Mar 14, 2019 · Application withdrawn

  • 30 Amethyst Rd · Minor variance

    To construct a new two-storey detached dwelling on Part 2.

    130 m away · filed Mar 14, 2019 · Application withdrawn

  • 30 Amethyst Rd · Consent

    To obtain consent to sever the property into two (2) undersized residential lots.

    130 m away · filed Mar 14, 2019 · Application withdrawn

Everything planned in Scarborough-Agincourt

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.