Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

365 Shuter St

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision to hvacHVAC - To alter the existing two-storey row house by constructing a second floor front addition, and completing interior alterations.

    Applied Aug 4, 2015 · issued Aug 11, 2015 · Permit 14 128188 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - To alter the existing two-storey row house by constructing a second floor front addition, and completing interior alterations.

    Applied Jul 10, 2015 · issued Jul 17, 2015 · Permit 14 128188 HVA

    Inspections under way
  • Small residential project · Multiple projects

    REV - # 1 moving the existing wall away for the property line. See drawings

    Applied Jul 6, 2015 · issued Jul 7, 2015 · Permit 14 128188 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - To alter the existing two-storey row house by constructing a second floor addition, and completing interior alterations.

    Applied Mar 13, 2014 · issued Mar 19, 2014 · Permit 14 128188 PLB

    Inspections under way
  • Small residential project · Multiple projects

    To alter the existing two-storey row house by constructing a second floor front addition, and completing interior alterations.

    Applied Mar 13, 2014 · issued Mar 19, 2014 · Permit 14 128188 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 358 Queen St E · Minor variance

    To convert the second and third levels from residential units into commercial use(s).

    160 m away · filed Aug 24, 2023 · Approved

  • 351 Queen St E · Minor variance

    To alter the approved mixed-use development by increasing the height of the building that consists of 10, 12, 13 and 27-storeys, as shown on the Revised Diagram 3. Also, to increase both the total and residential gross floor areas, and to reduce the non-residential gross floor area, the number of vehicular parking spaces, and the residential amenity spaces.

    210 m away · filed Aug 23, 2023 · Approved

  • 387 Shuter St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear third storey terrace.

    50 m away · filed Apr 20, 2022 · Approved

  • 359 Shuter St · Minor variance

    To construct a new three-storey, two-unit townhouse with a front porch, a front basement walkout, a rear ground floor deck, a rear second storey balcony and a rear third storey terrace. The existing one-and-one-half-storey townhouse will be demolished.

    20 m away · filed Feb 8, 2022 · Approved

  • 38 St Paul St · Minor variance

    To construct a two-storey detached dwelling (containing two dwelling units) with a front porch, two rear decks to provide two separate entry ways, a rear basement walkout and a rear second storey deck. Also, one parking space will be provided, abutting the laneway.

    250 m away · filed Sep 7, 2021 · Approved

  • 29 Tracy St · Minor variance

    To alter the existing three-storey semi-detached dwelling by adding a rear third storey addition (greenhouse).

    40 m away · filed Jan 30, 2020 · Approved

  • 385 Shuter St · Minor variance

    To alter the existing 2½-storey semi-detached dwelling by constructing a rear 2-storey addition with a ground floor deck and third floor terrace.

    50 m away · filed Oct 13, 2017 · Approved

  • 339 Queen St E · Minor variance

    To alter the existing three-storey office building by constructing a south-east exit vestibule.

    240 m away · filed Feb 3, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.