Toronto address · Ward 14, Toronto-Danforth
37 Bonnie Brae Blvd
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Porch
Proposal to reconstruct proch and stairs. roof and columns to remain
Applied Aug 17, 2015 · issued Aug 18, 2015 · Permit 15 207735 BLD
- Inspections under way
Small residential project · Multiple projects
Remove rear structure shed (attached) remove landing & rear main floor masonry/ wall removal.New frame wall at rear and new rear deck and canopy.
Applied May 4, 2010 · issued May 5, 2010 · Permit 10 168422 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
48 Queensdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.
250 m away · filed May 25, 2026 · Approved
208 Linsmore Cres · Minor variance
To legalize and maintain the building height of the existing two-storey detached dwelling (as approved by Minor Variance Decision A0187/22TEY), which was constructed beyond the limits of the authorized building permit No. 22 219682 BLD 00 NH.
190 m away · filed May 6, 2026 · Approved
385 Sammon Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).
220 m away · filed Feb 27, 2026 · Approved
353 Monarch Park Ave · Minor variance
To alter the existing two-storey detached dwelling by converting the integral garage into habitable space. Also, to permit a front yard parking space.
200 m away · filed Feb 13, 2026 · Approved
6 Kimbourne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (the existing rear one-storey will be demolished) with a ground floor deck and stairs. Also, to construct a new one-storey ancillary building (detached shed), in the rear yard of the property. The existing rear ancillary building (semi-detached garage) will be demolished.
220 m away · filed Sep 23, 2025 · Approved
356 Monarch Park Ave · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition- (which will be cantilevered on the south side) with front and rear balconies, a rear one-storey addition, a front one-storey addition with a covered porch, a rear ground floor deck, and a rear basement walkout. Also, to construct a new one-storey detached ancillary building (to contain a garage), in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit occupying the first and second levels).
200 m away · filed Aug 14, 2025 · Approved
473 Sammon Ave · Minor variance
To permit a personal service shop use (laundromat on the ground level and within the basement) within the existing two-storey mixed-use building (municipally known 473 Sammon Avenue). Also, to permit an office use (human resources firm on the ground level and within the basement) within the existing two-storey mixed-use building (municipally known 479 Sammon Avenue).
220 m away · filed May 6, 2025 · Approved
457 Mortimer Ave · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard. The existing two-storey detached dwelling will be maintained and unaltered.
130 m away · filed Jan 10, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.