Toronto address · Ward 19, Beaches-East York
37 Herbert Ave
The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Revision #1 - changes to rear addition and layout changes
Applied Jul 10, 2023 · issued Jul 24, 2023 · Permit 22 136841 BLD (revision 01)
- Revision issued
Heating and ventilation
HVAC - Proposal to construct a rear one storey addition, interior alterations and benching to an existing semi-detached SFD.
Applied Jul 10, 2023 · issued Jul 17, 2023 · Permit 22 136841 HVA (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a rear one storey addition, interior alterations and benching to an existing semi-detached SFD.
Applied Apr 21, 2022 · issued May 20, 2022 · Permit 22 136841 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a rear one storey addition, interior alterations and benching to an existing semi-detached SFD.
Applied Apr 21, 2022 · issued May 20, 2022 · Permit 22 136841 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a rear one storey addition, interior alterations and benching to an existing semi-detached SFD.
Applied Apr 21, 2022 · issued May 20, 2022 · completed Apr 22, 2025 · Permit 22 136841 PLB
- Closed
Drains and site services
Drain - Proposal to construct a rear one storey addition, interior alterations and benching to an existing semi-detached SFD.
Applied Apr 21, 2022 · issued May 20, 2022 · completed Dec 7, 2023 · Permit 22 136841 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · 123 homes · Mixed use
400 m away · Rezoning · Under review · filed Mar 18, 2025
- Under review
73-83 Woodbine Avenue and 3 Buller Avenue
6 storeys · 86 homes · Residential
460 m away · Site plan · Under review · filed Mar 31, 2022
Neighbours’ Committee of Adjustment files within 250 m
100 Kippendavie Ave · Minor variance
240 m away · filed Sep 14, 2026 · Postponed
52 Herbert Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front covered basement walkout, a front ground floor covered deck with stairs, and a front second storey deck.
70 m away · filed Aug 26, 2026 · Hearing scheduled
30 Norway Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
240 m away · filed Jun 10, 2026 · Approved
28 Hartford Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition.
170 m away · filed Apr 1, 2026 · Approved
40 Norway Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
250 m away · filed Jun 27, 2025 · Approved
62 Columbine Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by enclosing the front porch and constructing a new front landing with stairs.
240 m away · filed Jun 19, 2025 · Approved
135 Kenilworth Ave · Minor variance
To construct a new two-storey ancillary building (containing one garden suite) in the rear yard of the existing two-storey detached dwelling. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
230 m away · filed May 26, 2025 · Approved
75 Herbert Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear first and second storey additions.
140 m away · filed Feb 11, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.