Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

37 Playter Cres

The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision 1. HVAC - Proposal to construct new two storey rear addition, new dormers at existing third floor, interior renovations, basement underpinning, and new front porch roof and rear stairs.

    Applied Nov 19, 2018 · issued Nov 21, 2018 · completed Aug 13, 2020 · Permit 18 184944 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct new two storey rear addition, new dormers at existing third floor, interior renovations, basement underpinning, and new front porch roof and rear stairs.

    Applied Nov 1, 2018 · issued Nov 6, 2018 · completed Aug 13, 2020 · Permit 18 184944 HVA

    Closed
  • Small residential project · Multiple projects

    Revision 1. Revision to ground floor framing at addition due to pier relocation as per arborist direction, clarification of new roof framing at existing front porch

    Applied Oct 11, 2018 · issued Oct 25, 2018 · completed Aug 13, 2020 · Permit 18 184944 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal to construct new two storey rear addition, new dormers at existing third floor, interior renovations, basement underpinning, and new front porch roof and rear stairs.

    Applied Jun 26, 2018 · issued Jul 23, 2018 · completed Aug 13, 2020 · Permit 18 184944 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct new two storey rear addition, new dormers at existing third floor, interior renovations, basement underpinning, and new front porch roof and rear stairs.

    Applied Jun 26, 2018 · issued Jul 23, 2018 · completed Aug 13, 2020 · Permit 18 184944 BLD

    Closed
  • Drains and site services

    Drain - Proposal to construct new two storey rear addition, new dormers at existing third floor, interior renovations, basement underpinning, and new front porch roof and rear stairs.

    Applied Jun 26, 2018 · issued Jul 23, 2018 · completed Sep 21, 2018 · Permit 18 184944 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing 2½-storey detached dwelling by constructing a new front porch roof, a rear two-storey addition and expanding the third floor with two dormers and a rear deck.

    Decision: Approved (hearing May 23, 2018)

    Filed Nov 23, 2017 · File A1293/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 32 Bayfield Cres · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage) by constructing a complete second storey addition (containing one garden suite) with an east side cantilevered portion, and a north side flat roof cantilevered extension. Also, to construct an east side ground floor covered lounge (located below the cantilevered portion of the second level). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).

    190 m away · filed Jul 21, 2026 · Hearing scheduled

  • 82 Chester Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing third storey dormers (on the north and south sides), for habitable space within the attic.

    190 m away · filed Apr 14, 2026 · Approved

  • 40 Chester Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a new rear stone patio with side (north and south) brick walls and side (north and south) and rear (west) stairs. The existing rear ground floor wood deck with stairs will be demolished.

    170 m away · filed Mar 20, 2026 · Approved

  • 46 Playter Cres · Minor variance

    To construct a new three-storey detached dwelling with a side (west) basement walkout (including a new secondary suite), a front covered porch with stairs, a rear ground floor deck with stairs, and a rear third storey balcony. Also, to convert the existing rear one-storey detached ancillary building (garage) into a garden shed. There will be a total of two dwelling units on the lot.

    60 m away · filed Feb 20, 2026 · Approved

  • 4 Hurndale Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition at the northwest corner of the dwelling, with a basement addition below (the existing basement walkout will be demolished).

    160 m away · filed Dec 4, 2025 · Approved

  • 36 Chester Ave · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing a complete third-storey addition (expanding the existing vacant attic space into a full third storey), a rear ground floor deck, and enclosing a portion of the existing front porch with a new basement extension below.

    170 m away · filed Aug 18, 2025 · Approved

  • 68 Jackman Ave · Consent

    To obtain consent for a technical severance of the property for the purpose of re-establishing an easement/right-of-way.

    180 m away · filed Mar 6, 2025 · Approved

  • 40 Playter Blvd · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear one-storey ground floor addition and a rear third storey dormer addition.

    140 m away · filed Jan 29, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.