Toronto address · Ward 14, Toronto-Danforth
37 Sammon Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Deck
Proposal to construct 1 level rear deck
Applied Aug 26, 2021 · issued Sep 3, 2021 · completed Jul 11, 2022 · Permit 21 204554 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to washroom in basement of existing sfd
Applied Feb 24, 2021 · issued Mar 8, 2021 · completed Nov 18, 2021 · Permit 21 119756 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to washroom in basement of existing sfd
Applied Feb 24, 2021 · issued Mar 8, 2021 · completed Nov 18, 2021 · Permit 21 119756 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal fto install BWV for exisitng SFD
Applied Feb 24, 2021 · issued Feb 26, 2021 · completed Apr 28, 2021 · Permit 21 119797 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the existing two-storey detached dwelling by constructing a rear deck and maintain the existing driveway.
Decision: Approved (hearing Jul 28, 2021)
Filed Mar 31, 2021 · File A0427/21TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
240 m away · filed Sep 2, 2026 · Hearing scheduled
88 Woodycrest Ave · Minor variance
To construct a new one-storey detached ancillary building (shed) in the rear yard. The existing rear one-storey detached ancillary building (shed) will be demolished.
230 m away · filed Aug 11, 2026 · Hearing scheduled
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
220 m away · filed Jun 2, 2026 · Accepted
96 Woodycrest Ave · Minor variance
To alter the existing three-storey detached dwelling (currently under construction from the original building permit (No. 25 250398 BLD 00 SR)) by constructing a new front porch with a canopy and stairs.
210 m away · filed May 8, 2026 · Approved
45 Kings Park Blvd · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing covered front porch).
130 m away · filed Oct 3, 2025 · Approved
97 Woodycrest Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a balcony.
240 m away · filed Mar 21, 2025 · Approved
193 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.
200 m away · filed Feb 19, 2025 · Approved
234 Browning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.
200 m away · filed Jul 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.