Toronto address · Ward 13, Toronto Centre
373 Yonge St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation · Unknown
Supply and install h.v.a.c. Refer to 424271 for cost and plans.
Applied Jun 11, 1999 · issued Jun 25, 1999 · completed Aug 2, 2019 · Permit 99 017616 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
348-356 Yonge Street, 2 Elm Avenue and 8 Elm Street
819 homes · Residential
70 m away · Condominium · Under review · filed Sep 17, 2021
- Under review
76 storeys · 828 homes · Mixed use
90 m away · Site plan · Under review · filed Jun 14, 2022
- Under review
20 Gerrard Street East and 21 McGill Street
7 storeys · Residential
100 m away · Site plan · Under review · filed May 25, 2026
- Under review
44 storeys · 247 homes · Mixed use
130 m away · Rezoning · Under review · filed Sep 26, 2022
- Under review
- Under appeal
30 storeys · 216 homes · Mixed use
140 m away · Site plan · Under appeal · filed Sep 13, 2022
Neighbours’ Committee of Adjustment files within 250 m
332 Yonge St · Minor variance
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
130 m away · filed Jul 24, 2026 · Hearing scheduled
50 Gerrard St E · Consent
To obtain consent to sever a portion of stratified land (air-rights above an elevation of 121 m) for the purpose of a lot addition.
240 m away · filed May 15, 2026 · Postponed
8 Elm St · Consent
To obtain consent to sever the property into two lots, as well as maintaining existing easements/rights-of-way.
80 m away · filed Feb 23, 2024 · Approved
50 Gerrard St E · Minor variance
To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.
240 m away · filed Nov 14, 2023 · Approved
340 Yonge St · Minor variance
To permit an amusement arcade use (claw machines) on the ground level of the existing three-storey commercial building.
90 m away · filed Sep 8, 2023 · Approved
137 Bond St · Minor variance
To alter the existing three-storey building by constructing an east side five-storey addition above, a rear eight-storey addition, front and west side third storey dormer additions, with a fourth storey rooftop terrace, and green roofs on the second, sixth, seventh, and eighth storey. The building will be used to facilitate the University Health and Wellness programs.
250 m away · filed Apr 6, 2023 · Approved
363 Yonge St · Minor variance
To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)).
20 m away · filed Dec 30, 2022 · Approved
8 Elm St · Minor variance
To permit the reduction of residential parking spaces provided within the 68-storey mixed-use building, currently under review by Site Plan Control Application (File Number 21 214195 STE 11 SA). There will be a total of 807 residential dwelling units within this building.
80 m away · filed Apr 7, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.