Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

38 Norway Ave

The City of Toronto has 10 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Party wall administration permit for work at 40 Norway Ave. See permit #25 229928 BLD 00 SR.

    Applied Oct 22, 2025 · completed Oct 22, 2025 · Permit 25 243477 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Basement underpinning and finishing. ALL NEW HVAC to serve whole house - reconnect existing 2nd floor ducting to new trunklines.

    Applied Oct 2, 2023 · issued Oct 18, 2023 · completed Aug 6, 2025 · Permit 23 148713 HVA

    Closed
  • Small residential project · Multiple projects

    Basement underpinning and finishing

    Applied May 21, 2023 · issued Jun 9, 2023 · completed Aug 6, 2025 · Permit 23 148713 BLD

    Closed
  • Drains and site services

    Drain, backwater valve and sump pump - Basement underpinning and finishing

    Applied May 21, 2023 · issued Jun 13, 2023 · completed Aug 6, 2025 · Permit 23 148713 DRN

    Closed
  • Heating and ventilation

    REV01: layout changes as per drawings

    Applied Oct 25, 2019 · issued Nov 1, 2019 · completed Feb 18, 2020 · Permit 19 176208 HVA (revision 01)

    Closed
  • Drains and site services · Back water valve (Sewer only)

    install back water valve

    Applied Sep 4, 2019 · issued Sep 4, 2019 · completed Jul 13, 2020 · Permit 19 215711 DRN

    Closed
  • Small residential project · Multiple projects

    Revision #01 - Changes to interior layout and to add new rear, second storey addition.Proposal for interior alterations to the existing semi detached dwelling, reframing existing 1 storey rear addition removal of a partition wall on the ground floor and a new 2nd floor bathroom

    Applied Aug 15, 2019 · issued Sep 5, 2019 · completed Feb 28, 2020 · Permit 19 176208 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the existing semi detached dwelling, reframing existing 1 storey rear addition removal of a partition wall on the ground floor and a new 2nd floor bathroom

    Applied Aug 11, 2019 · issued Aug 16, 2019 · completed Feb 18, 2020 · Permit 19 176208 HVA

    Closed
  • Small residential project · Multiple projects

    Proposal for interior alterations to the existing semi detached dwelling, reframing existing 1 storey rear addition removal of a partition wall on the ground floor and a new 2nd floor bathroom

    Applied Jun 21, 2019 · issued Jul 15, 2019 · completed Feb 28, 2020 · Permit 19 176208 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to the existing semi detached dwelling, reframing existing 1 storey rear addition removal of a partition wall on the ground floor and a new 2nd floor bathroom

    Applied Jun 21, 2019 · issued Jul 15, 2019 · completed Feb 28, 2020 · Permit 19 176208 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by constructing a new second-storey addition over the existing one-storey portion at the rear and a new ground floor deck.

    Decision: Approved (hearing Jul 17, 2019)

    Filed Mar 19, 2019 · File A0277/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 419-425 Woodbine Avenue

    11 storeys · 123 homes · Mixed use

    180 m away · Rezoning · Under review · filed Mar 18, 2025

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 52 Herbert Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front covered basement walkout, a front ground floor covered deck with stairs, and a front second storey deck.

    210 m away · filed Aug 26, 2026 · Hearing scheduled

  • 30 Norway Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.

    20 m away · filed Jun 10, 2026 · Approved

  • 28 Hartford Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition.

    80 m away · filed Apr 1, 2026 · Approved

  • 390 Woodbine Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. Also, the existing rear two-storey partial addition on the dwelling and the ancillary building (shed), in the rear yard, will be demolished. The existing rear parking pad, abutting the laneway will be maintained and unaltered.

    160 m away · filed Oct 14, 2025 · Approved

  • 40 Norway Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.

    10 m away · filed Jun 27, 2025 · Approved

  • 62 Columbine Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by enclosing the front porch and constructing a new front landing with stairs.

    170 m away · filed Jun 19, 2025 · Approved

  • 75 Herbert Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing rear first and second storey additions.

    110 m away · filed Feb 11, 2025 · Approved

  • 52 Herbert Ave · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two lots which merged on title. The existing building will be maintained and unaltered.

    210 m away · filed Apr 9, 2024 · Application withdrawn

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.