Toronto address · Ward 5, York South-Weston
38 William St
The City of Toronto has 6 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing
Plumbing - Propose to construct an accessory dwelling unit at basement
Applied Aug 10, 2026 · issued Aug 12, 2026 · Permit 26 217073 PLB
- Permit issued
Small residential project · Interior alterations
Propose to construct an accessory dwelling unit at basement
Applied Aug 10, 2026 · issued Aug 12, 2026 · 1 home added · Permit 26 217073 BLD
- Closed
Small residential project · Multiple projects
Revision #1: Changes to height of first floor framing and resulting changes to front porch and rear deck.(Construct second floor addition, ground floor interior alterations, new rear deck to single family dwelling.)
Applied Apr 3, 2012 · issued Apr 23, 2012 · completed Oct 4, 2023 · Permit 10 231510 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Construct second floor addition, ground floor interior alterations, new rear deck to single family dwelling.
Applied Jul 30, 2010 · issued Oct 8, 2010 · completed Oct 4, 2023 · Permit 10 231510 HVA
- Closed
Plumbing
Plumbing - Construct second floor addition, ground floor interior alterations, new rear deck to single family dwelling.
Applied Jul 30, 2010 · issued Oct 7, 2010 · completed Oct 4, 2023 · Permit 10 231510 PLB
- Closed
Small residential project · Multiple projects
Construct second floor addition, ground floor interior alterations, new rear deck to single family dwelling. THE FILE IS WITH NB MARCH 2/2012
Applied Jul 30, 2010 · issued Oct 7, 2010 · completed Oct 4, 2023 · Permit 10 231510 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
53 storeys · 463 homes · Mixed use
380 m away · Site plan · Under review · filed Sep 21, 2021
- Under review
- Under review
Neighbours’ Committee of Adjustment files within 250 m
29 William St · Minor variance
To construct a two storey rear addition, a second storey addition above the existing dwelling, and an attached garage along the west side of the dwelling.
50 m away · filed Feb 28, 2025 · Deferred
15 Springmount Ave · Minor variance
To construct a new triplex dwelling.
110 m away · filed Apr 10, 2024 · Approved
105 John St · Minor variance
To construct a two-storey rear addition and to enclose an existing front porch.
60 m away · filed Sep 6, 2023 · Approved
46 William St · Minor variance
To construct a second storey addition above the existing dwelling, a two-storey rear addition and a new two-storey ancillary building in the rear yard which contains a garage located on the first storey and a garden suite located on the second storey.
40 m away · filed May 3, 2023 · Approved
127 King St · Minor variance
To legalize and to maintain the partially built detached garage in the rear yard.
250 m away · filed Mar 6, 2023 · Approved
92 John St · Minor variance
To construct a second storey addition, a side entry at west elevation and a front balcony.
90 m away · filed Jan 25, 2023 · Approved
45 William St · Minor variance
To construct a garden suite in the rear yard.
60 m away · filed Jan 13, 2023 · Refused
25 William St · Minor variance
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0406/20EYK) approved variances related to floor space index and side yard setback.
60 m away · filed Dec 19, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.