Toronto address · Ward 14, Toronto-Danforth
380 Sammon Ave
The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal ro install a backwater valve.
Applied May 13, 2025 · issued May 16, 2025 · completed May 25, 2025 · Permit 25 158822 DRN
- Closed
Plumbing
Plumbing - Proposal to construct a new one storey rear addition with a small walkout stair and interior alterations to the ground floor.
Applied Mar 3, 2020 · issued May 19, 2020 · completed Dec 22, 2020 · Permit 20 121427 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a new one storey rear addition, interior alterations to the ground floor and a new deck in the rear yard.
Applied Mar 3, 2020 · issued May 19, 2020 · completed Dec 22, 2020 · Permit 20 121427 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition.
Decision: Approved (hearing Oct 23, 2019)
Filed Jul 24, 2019 · File A0800/19TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
111 Linsmore Cres · Minor variance
200 m away · filed Aug 20, 2026 · Accepted
48 Queensdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.
90 m away · filed May 25, 2026 · Approved
385 Sammon Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).
70 m away · filed Feb 27, 2026 · Approved
6 Kimbourne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (the existing rear one-storey will be demolished) with a ground floor deck and stairs. Also, to construct a new one-storey ancillary building (detached shed), in the rear yard of the property. The existing rear ancillary building (semi-detached garage) will be demolished.
30 m away · filed Sep 23, 2025 · Approved
38 Leroy Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing front and rear one-storey additions on the first level, a front porch with stairs, a rear deck with stairs, and a rear at-grade patio. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.
170 m away · filed May 28, 2025 · Approved
457 Mortimer Ave · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard. The existing two-storey detached dwelling will be maintained and unaltered.
180 m away · filed Jan 10, 2025 · Approved
364 Sammon Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a front covered porch, front and rear one-storey additions, a complete second storey addition above the entire dwelling, and a rear ground floor deck. The existing one-storey ancillary building (shed) and driveway, in the rear yard, abutting Leroy Avenue, will be maintained and unaltered.
70 m away · filed Jan 2, 2025 · Approved
42 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front covered porch, and front and rear third floor balconies facing the side (north) lot line. The existing one-storey detached dwelling, and rear detached garage will be demolished.
250 m away · filed Jul 31, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.