Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

389 Jones Ave

The City of Toronto has 8 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Proposal to replace and rearrange existing plumbing and fixtures in second floor bathroom.

    Applied Jun 13, 2025 · completed Jun 17, 2025 · Permit 25 177105 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal to replace and rearrange existing plumbing and fixtures in second floor bathroom.

    Applied Jun 13, 2025 · completed Jun 17, 2025 · Permit 25 177105 PLB

    Cancelled
  • Heating and ventilation

    HVAC - A 2 piece (sink and toilet) bathroom will be added in a new enclosed room in the basement.

    Applied Nov 21, 2024 · issued Dec 13, 2024 · completed Jan 10, 2025 · Permit 24 237665 HVA

    Closed
  • Small residential project · Interior alterations

    A 2 piece (sink and toilet) bathroom will be added in a new enclosed room in the basement.

    Applied Nov 12, 2024 · issued Nov 26, 2024 · Permit 24 237665 BLD

    Inspections under way
  • Plumbing

    Plumbing - A 2 piece (sink and toilet) bathroom will be added in a new enclosed room in the basement.

    Applied Nov 12, 2024 · issued Nov 26, 2024 · completed Jan 10, 2025 · Permit 24 237665 PLB

    Closed
  • Drains and site services

    Drain - A 2 piece (sink and toilet) bathroom will be added in a new enclosed room in the basement.

    Applied Oct 18, 2024 · completed Nov 6, 2024 · Permit 24 227922 DRN

    Cancelled
  • Plumbing

    Plumbing - A 2 piece (sink and toilet) bathroom will be added in a new enclosed room in the basement.

    Applied Oct 18, 2024 · completed Nov 6, 2024 · Permit 24 227922 PLB

    Cancelled
  • Small residential project · Interior alterations

    A 2 piece (sink and toilet) bathroom will be added in a new enclosed room in the basement.

    Applied Oct 18, 2024 · completed Nov 6, 2024 · Permit 24 227922 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 59 Blake St · Minor variance

    100 m away · filed Aug 28, 2026 · Postponed

  • 53 Hunter St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition and a new rear first storey deck with stairs.

    180 m away · filed Mar 31, 2026 · Approved

  • 27 Shudell Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a partial third storey addition, a front porch with stairs, a rear basement walkout with stairs, a rear ground floor deck with stairs, a rear second floor balcony, and a rear third floor rooftop deck. Also, to construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting the laneway.

    190 m away · filed Nov 18, 2025 · Approved

  • 416 Jones Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (front porch enclosure) with a bay window, a front porch with stairs, a rear two-storey addition (partially cantilevered on the west side) and a one-storey addition with a rear ground floor deck with stairs.

    120 m away · filed Nov 21, 2024 · Approved

  • 24 Hunter St · Minor variance

    To alter the existing two-and-one-half storey detached dwelling by constructing a rear one-storey addition with a new covered porch, and a side (west) third floor dormer addition, along with interior alterations.

    140 m away · filed May 13, 2024 · Approved

  • 59 Boultbee Ave · Minor variance

    To construct a new three-storey dwelling (duplex) with separate front integral garages, rear ground floor decks, and rear third storey balconies.

    90 m away · filed May 2, 2024 · Approved

  • 17 Boothroyd Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    140 m away · filed Nov 21, 2023 · Approved

  • 17 Boothroyd Ave · Minor variance

    To construct a new three-storey detached dwelling.

    140 m away · filed Nov 21, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.