Toronto address · Ward 19, Beaches-East York
39 Bastedo Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - 3 storey addition (60.91m2), interior alterations (71.3m2); finished basement (46.25m2) for the 2nd suite and new rear wood deck
Applied Apr 11, 2019 · issued May 14, 2019 · completed Dec 17, 2019 · Permit 19 139186 PLB
- Closed
Small residential project · Multiple projects
3rd storey addition (60.91m2), 3 storey rear addition, interior alterations (71.3m2); finished basement (46.25m2) for the 2nd suite and new rear wood deck
Applied Apr 11, 2019 · issued May 14, 2019 · completed Dec 17, 2019 · 1 home added · Permit 19 139186 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a rear deck, basement walk-out, underpinning and interior alterations.
Applied Feb 21, 2018 · issued Feb 27, 2018 · completed Dec 17, 2019 · Permit 18 119431 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a rear deck, basement walk-out, underpinning and interior alterations.
Applied Feb 21, 2018 · issued Feb 27, 2018 · completed Dec 20, 2018 · Permit 18 119431 BLD
- Closed
Drains and site services
Drain - Proposal to construct a rear deck, basement walk-out, underpinning and interior alterations.
Applied Feb 21, 2018 · issued Feb 27, 2018 · completed Dec 17, 2019 · Permit 18 119431 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 1½-storey semi-detached dwelling by constructing a rear two-storey addition with ground floor deck, a third storey addition with a rear balcony and to establish a secondary suite in the basement.
Decision: Refused (hearing Oct 3, 2018)
Filed May 3, 2018 · File A0463/18TEY
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 60 homes · Mixed use
370 m away · Site plan · Under review · filed Dec 9, 2024
Neighbours’ Committee of Adjustment files within 250 m
19 Bastedo Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition (converting the existing rear third storey terrace into habitable space).
80 m away · filed May 15, 2024 · Approved
44 Roseheath Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition.
120 m away · filed Nov 10, 2023 · Approved
109 Hillingdon Ave · Minor variance
To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition.
230 m away · filed Oct 10, 2023 · Approved
91 Drayton Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition with a rear balcony, a front ground floor covered porch, and a rear ground level deck.
120 m away · filed Feb 21, 2023 · Approved
64 Drayton Ave · Minor variance
To alter the existing two-storey detached dwelling by enclosing the existing front porch for additional habitable space and to construct a new front porch and stairs.
120 m away · filed Feb 21, 2023 · Approved
16 West Lynn Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition (that will be cantilevered at the rear) and a front second storey addition.
170 m away · filed Nov 1, 2022 · Approved
6 Roseheath Ave · Minor variance
To alter the existing two-storey dwelling by constructing a rear second storey addition.
50 m away · filed Sep 9, 2022 · Approved
26 Roseheath Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a new ground level deck.
70 m away · filed Jul 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.