  • Small residential project · Multiple projects

    Revision to the stairs for the front porch, exterior wall material, basement new LVL beams and footings, ground floor framing for balcony, second floor existing ceiling joist layout per site condition

    Applied Jan 5, 2024 · issued Jan 19, 2024 · completed Dec 4, 2024 · Permit 21 238517 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed second floor new addition and interior alteration work for the existing 2-Stories dwelling house

    Applied Nov 16, 2021 · issued Sep 7, 2022 · completed Aug 14, 2024 · Permit 21 238517 HVA

    Closed
  • Plumbing

    Plumbing - Proposed second floor new addition and interior alteration work for the existing 2-Stories dwelling house

    Applied Nov 16, 2021 · issued Sep 8, 2022 · completed Nov 13, 2024 · Permit 21 238517 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed second floor new addition and interior alteration work for the existing 2-Stories dwelling house

    Applied Nov 16, 2021 · issued Sep 7, 2022 · completed Dec 4, 2024 · Permit 21 238517 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 23 Huntington Ave · Minor variance

    To construct an addition to the rear of the existing detached garage.

    150 m away · filed Jun 9, 2026 · Hearing scheduled

  • 70 Commonwealth Ave · Minor variance

    To construct a new two-storey detached dwelling. The existing one-storey dwelling will be demolished.

    210 m away · filed May 1, 2026 · Approved

  • 757 Midland Ave · Minor variance

    To construct a new two-storey garden suite in the rear yard.

    180 m away · filed Jan 29, 2026 · Approved

  • 64 Commonwealth Ave · Minor variance

    To permit rear and side yard hard landscaping. There will be no alterations to the existing two-storey dwelling.

    170 m away · filed Aug 15, 2025 · Approved

  • 23 Commonwealth Ave · Minor variance

    To alter the existing two-storey dwelling by enclosing the front porch and constructing a rear yard two-storey addition with a rear yard deck.

    120 m away · filed May 7, 2025 · Approved

  • 45 Commonwealth Ave · Minor variance

    To construct a new two-storey detached building (triplex) with a front covered porch, front ground floor balcony, front second storey balcony, rear ground floor deck, rear second storey balcony and rear basement walkout. The existing one-storey detached dwelling will be demolished.

    40 m away · filed Mar 24, 2025 · Approved

  • 24 Winter Ave · Minor variance

    To construct a new two-storey detached dwelling with a secondary suite in the basement. There will be a total of two dwelling units on the lot.

    180 m away · filed Jan 15, 2025 · Approved

  • 60 Huntington Ave · Minor variance

    To construct a new three-storey fourplex. Cross reference Consent and Minor Variance Applications A0006/25SC and B0003/25SC being considered jointly.

    130 m away · filed Dec 31, 2024 · Refused

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.