Toronto address · Ward 20, Scarborough Southwest
39 Fallingbrook Dr
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Pending parent folder review
Plumbing
Plumbing - Proposal to alter existing 2 storey dwelling with interior alterations to all floors, alterations to exterior window openings
Applied Sep 24, 2026 · Permit 26 243363 PLB
- Not started - express
Small residential project · Interior alterations
Proposal to alter existing 2 storey dwelling with interior alterations to all floors, alterations to exterior window openings
Applied Sep 24, 2026 · Permit 26 243363 BLD
- Closed
Small residential project · Finishing basements
Interior alterations the the basement
Applied May 4, 2026 · issued May 8, 2026 · completed Sep 4, 2026 · Permit 26 154363 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
16 Fallingbrook Dr · Minor variance
To construct a new second floor addition above the existing garage.
130 m away · filed Aug 18, 2026 · Hearing scheduled
46 Fallingbrook Dr · Minor variance
To construct an addition to the existing dwelling.
160 m away · filed Oct 25, 2024 · Approved
34 Fallingbrook Dr · Minor variance
To demolish the existing dwelling and to construct a new detached three storey dwelling. This application was previously deferred at the March 2024 hearing.
70 m away · filed Jan 4, 2024 · Approved
12 Fallingbrook Wds · Minor variance
To construct an ancillary building and to alter the existing dwelling with interior alterations, a 3rd floor addition, rear addition and 1-storey front addition. A previous minor variance application was approved in February 2023 MV#A0256/22SC.
160 m away · filed Sep 26, 2023 · Approved
7 Fallingbrook Wds · Minor variance
To construct a new enclosure over existing porch, first floor rear addition and second floor rear addition to extend existing stair landing. Also a second floor front addition.
190 m away · filed Nov 29, 2022 · Approved
12 Fallingbrook Wds · Minor variance
To construct a third floor addition, rear addition, front addition and interior alterations to existing dwelling.
160 m away · filed Nov 10, 2022 · Approved
8 Fallingbrook Wds · Minor variance
To permit the construction of a new 3-storey detached dwelling and an ancillary building/cabana. The development proposal requires variances to the Zoning By-laws. NOTE: This Revised Public Hearing Notice is to correct Variance 10. by identifying the maximum permitted height for the top of an entrance to an ancillary buildings as 2.5 metres instead of 4 metres.
170 m away · filed Sep 3, 2021 · Approved
43 Fallingbrook Dr · Minor variance
To construct a second storey addition over the existing garage, a single storey extension to the garage and a new front porch.
60 m away · filed Mar 15, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.