Toronto address · Ward 5, York South-Weston
39 Haney Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct two storey rear addition, detached garage, rear deck, covered front porch with cold cellar and interior alterations
Applied Jul 4, 2022 · issued Jul 5, 2022 · completed Dec 28, 2023 · Permit 21 205691 HVA
- Closed
Plumbing
Plumbing - Proposal to construct two storey rear addition, detached garage, rear deck, covered front porch with cold cellar and interior alterations
Applied Aug 29, 2021 · issued Oct 13, 2021 · completed Dec 28, 2023 · Permit 21 205691 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct two storey rear addition, detached garage, rear deck, covered front porch with cold cellar and interior alterations
Applied Aug 29, 2021 · issued Oct 13, 2021 · completed Dec 28, 2023 · Permit 21 205691 BLD
- Closed
Drains and site services
Drain - Install back water valve and sump pump.Proposal to construct two storey rear addition, detached garage, rear deck, covered front porch with cold cellar and interior alterations
Applied Aug 29, 2021 · issued Oct 13, 2021 · completed Dec 28, 2023 · Permit 21 205691 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey rear addition with a basement walkout, an attached garage along the west side of the dwelling, a covered front porch and a deck in the rear yard.
Decision: Refused (hearing Feb 9, 2021)
Filed Oct 30, 2020 · File A0438/20EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
30 Ellins Ave · Minor variance
To construct a new detached garage in the rear yard.
130 m away · filed Feb 11, 2025 · Approved
34 Glamis Ave · Minor variance
170 m away · filed Oct 2, 2024 · Accepted
34 Glamis Ave · Consent
170 m away · filed Oct 2, 2024 · Accepted
34 Glamis Ave · Minor variance
170 m away · filed Oct 2, 2024 · Accepted
15 Duern St · Minor variance
To construct a new detached garage with garden suite above.
70 m away · filed Dec 22, 2023 · Approved
34 Ellins Ave · Minor variance
To construct a rear two storey addition, a new secondary suite in the basement, and new rear deck.
110 m away · filed May 10, 2022 · Approved
4 Duern St · Minor variance
To construct a new detached garage in the rear yard.
220 m away · filed Oct 6, 2021 · Approved
18 Glamis Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new front porch and a new detached garage.
240 m away · filed Dec 3, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.