Toronto address · Ward 13, Toronto Centre
39 Mutual St
The City of Toronto has 11 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
REV 02: to change drain pipe material and remove return air plenumRev 01 - The luggage lift is removed from the electrical and mechanical drawingsPlumbing - Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a 4th floor addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with seven guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Jun 4, 2025 · issued Jun 17, 2025 · completed Apr 14, 2026 · Permit 22 186011 PLB (revision 02)
- Revision issued
Heating and ventilation
REV 02: to change drain pipe material and remove return air plenumRev 01 - The luggage lift is removed from the electrical and mechanical drawingsHVAC - Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a 4th floor addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with seven guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Jun 4, 2025 · issued Jun 17, 2025 · Permit 22 186011 HVA (revision 02)
- Closed
Addition or alteration · Multiple projects
Rev 02: To reinforce the existing single-wythe masonry party walls. Revised internal exit stair/corridor configuration and exterior steel exit stair. Rev 01 - The luggage lift is removed from the electrical and mechanical drawingsProposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a roof enclosure (stairway) addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with 7 guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Jul 31, 2024 · issued Sep 20, 2024 · completed Apr 14, 2026 · Permit 22 186011 BLD (revision 02)
- Revision issued
Heating and ventilation
Rev 01 - The luggage lift is removed from the electrical and mechanical drawingsHVAC - Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a 4th floor addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with seven guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Oct 16, 2023 · issued Nov 14, 2023 · Permit 22 186011 HVA (revision 01)
- Closed
Addition or alteration · Multiple projects
Rev 01 - The luggage lift is removed from the electrical and mechanical drawingsProposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a roof enclosure (stairway) addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with 7 guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Oct 16, 2023 · issued Nov 14, 2023 · completed Apr 14, 2026 · Permit 22 186011 BLD (revision 01)
- Closed
Plumbing
Rev 01 - The luggage lift is removed from the electrical and mechanical drawingsPlumbing - Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a 4th floor addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with seven guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Oct 16, 2023 · issued Nov 3, 2023 · completed Apr 14, 2026 · Permit 22 186011 PLB (revision 01)
- Closed
Addition or alteration · Multiple projects
Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a roof enclosure (stairway) addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with 7 guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Aug 4, 2022 · issued Sep 20, 2023 · completed Apr 14, 2026 · 3 homes added · Permit 22 186011 BLD
- Closed
Plumbing
Plumbing - Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a 4th floor addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with seven guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Aug 4, 2022 · issued Aug 22, 2023 · completed Apr 14, 2026 · Permit 22 186011 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal for multiple projects to an existing 3 storey townhouse. Scope of work includes a 4th floor addition, new roof deck, fire exits, rear decks and interior alterations to convert to a hotel use with seven guest suites. See also 20 106433 ZZC and 20 201439 MV.
Applied Aug 4, 2022 · issued Aug 22, 2023 · Permit 22 186011 HVA
- Closed
Small residential project · Walk-Out stair
Proposed new front basement walkout, reconstruct the front porch and interior alterations to the basement unit
Applied Aug 10, 2016 · issued Jan 9, 2017 · completed Mar 11, 2026 · Permit 16 204763 BLD
- Closed
Residential building permit · Alteration to existing building
Make interior alterations and construct fire escape at rear.
Applied May 8, 2000 · issued Oct 4, 2000 · completed Mar 11, 2026 · 1 home added · Permit 00 148806 CMB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To convert the existing residential building containing three dwelling units and a fourth dwelling unit added without the benefit of a building permit to a non-residential building containing a hotel use with eight guest suites and zero dwelling units by legalizing and maintaining the rear ground floor and basement additions and constructing a fourth storey addition.
Decision: Approved (hearing Aug 25, 2021)
Filed Oct 1, 2020 · File A0883/20TEY
What’s planned nearby
Development sites within 500 m
- Under review
- Under review
32 storeys · 315 homes · Mixed use
140 m away · Rezoning · Under review · filed Mar 31, 2026
- Now selling
- Under review
119-127 Church Street and 83-89 Queen Street East
61 storeys · 691 homes · Mixed use
190 m away · Site plan · Under review · filed Aug 4, 2022
- Approved
50 storeys · 596 homes · Mixed use
250 m away · Rezoning · Approved · filed Nov 17, 2025
- Under review
59 storeys · 480 homes · Mixed use
260 m away · Site plan · Under review · filed Aug 18, 2022
Neighbours’ Committee of Adjustment files within 250 m
134 Jarvis St · Minor variance
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
70 m away · filed Sep 4, 2025 · Approved
53 Mutual St · Minor variance
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
90 m away · filed Jul 23, 2025 · Approved
225 Jarvis St · Minor variance
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
210 m away · filed Mar 4, 2025 · Approved
75 Mutual St · Minor variance
To alter the existing three-storey detached building by constructing a fourth storey addition, and a rear four-storey addition. This building will contain a total of 18 dwelling rooms (multi-tenant house).
160 m away · filed Dec 9, 2024 · Approved
203 Jarvis St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-way.
140 m away · filed Sep 17, 2024 · Approved
90 Queen St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
100 m away · filed Aug 19, 2024 · Approved
225 Jarvis St · Minor variance
To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.
210 m away · filed Jun 22, 2024 · Approved
167 Queen St E · Minor variance
To alter the existing three-storey mixed-use building by converting the second and third storey from a Residential use (a total of 5 dwelling units) into a Hotel use (a total of 10 rooms). Also, to construct a Personal Service Shop use within the basement. In addition, to convert the existing rear third storey terrace into an exterior amenity space by constructing a new canopy.
230 m away · filed Mar 13, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.