Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

39 Rankin Cres

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Proposal to construct interior alterations to the first floor of an existing townhouse.

    Applied Jul 26, 2022 · completed Dec 6, 2023 · Permit 22 182384 BLD

    Cancelled
  • Small residential project · Finishing basements

    Revised proposal - Interior alterations to basement and first floor to maintain a single family dwelling use of the building.Original proposal - Proposal to construct interior alterations to an existing basement including the creation of a seperate door of the basement from the outside on the ground level (first floor alterations to be included in another permit).

    Applied Jul 22, 2022 · issued Oct 21, 2022 · completed Feb 28, 2023 · Permit 22 180481 BLD

    Closed
  • Heating and ventilation · Install/Alter HVAC - only

    Supply and install h.v.a.c. system to proposed row house (unit type a).cost incl. 424953 under 1 Rankin Cr. see 00 - 125300 for plans under 17 Symington Av.

    Applied Feb 8, 2000 · issued Mar 2, 2000 · completed Mar 2, 2023 · Permit 00 126377 HVA

    Closed
  • Plumbing · Install/Alter plumbing - only

    Install Plumbing Fixtures: Basement: 1 Washing Machine, 1 Wash Tub; 2nd Fl.: 1 Kitchen Sink, 1 Dishwasher; 3rd Floor: 1 Wash Basin, 1 Bath Tub and 1 Water Closet.Install 4 inches sanitary and 3/4 inches Water Service. - Plans under Plumbing Permit Appl:: 121913. See BP: 429-953 Cost included. clrd as per ap

    Applied Jan 18, 2000 · issued Jan 21, 2000 · completed Mar 2, 2023 · Permit 00 121997 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 149 Perth Ave · Minor variance

    To legalize and to maintain the existing one-storey detached dwelling (including one and two-storey rear additions) by constructing a front ground floor covered porch with stairs, a front second storey addition, and a new rear ground floor stairs (for the existing one-storey sunroom). The existing rear two-storey ancillary building (containing a garage and storage space) will be maintained and unaltered. There will be a total of three residential dwelling units on this lot.

    220 m away · filed Feb 3, 2026 · Approved

  • 1319 Bloor St W · Consent

    To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.

    220 m away · filed Sep 3, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…

    220 m away · filed Apr 2, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    220 m away · filed Aug 16, 2024 · Approved

  • 83 Perth Ave · Minor variance

    To legalize and to maintain the rear second floor addition (conversion of the existing rear second floor deck into habitable space) and the rear dormer third floor addition that were constructed without an authorized building permit. Also, to permit the reconstruction of a rear third floor rooftop deck (previously constructed without an authorized building permit and since removed).

    230 m away · filed Aug 2, 2024 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    230 m away · filed Jan 17, 2024 · Refused

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    170 m away · filed Dec 12, 2023 · Approved

  • 89 Symington Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.

    240 m away · filed Oct 30, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.