Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

39 Seneca Ave

The City of Toronto has 16 building permits since 2017 (13 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed 2nd and 3rd floor addition, interior alterations, and conversion to duplex. More than 50% of the ground floor walls are being removed due to structural deficiencies.

    Applied Nov 4, 2025 · issued Nov 24, 2025 · Permit 25 186967 HVA

    Inspections under way
  • Demolition

    Proposed demolition as more than 50% of the ground floor walls are being removed due to structural deficiencies.

    Applied Jul 3, 2025 · issued Nov 20, 2025 · completed Nov 25, 2025 · 1 home removed · Permit 25 187647 DEM

    Closed
  • Plumbing

    Plumbing - Proposed 2nd and third floor addition, interior alterations, and conversion to duplex. More than 50% of the ground floor walls are being removed due to structural deficiencies.

    Applied Jul 2, 2025 · issued Nov 20, 2025 · Permit 25 186967 PLB

    Inspections under way
  • New house · New building - by renovation

    Proposed 2nd and 3rd floor addition, interior alterations, and conversion to duplex. More than 50% of the ground floor walls are being removed due to structural deficiencies.

    Applied Jul 2, 2025 · issued Nov 20, 2025 · 1 home added · Permit 25 186967 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposed 2nd and third floor addition, interior alterations, and conversion to duplex. More than 50% of the ground floor walls are being removed due to structural deficiencies.

    Applied Jul 2, 2025 · issued Nov 20, 2025 · Permit 25 186967 DRN

    Permit issued
  • Heating and ventilation

    Rev. 01 - PROPOSED REVISIONS TO ISSUED PERMIT #24 175725 HVA TO MAKE INTERIOR ALTERATION AND ADD A THIRD FLOOR

    Applied Mar 18, 2025 · issued Mar 24, 2025 · Permit 24 175725 HVA (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    REV 01: PROPOSED REVISIONS TO ISSUED PERMIT #24 175725 BLD TO MAKE INTERIOR ALTERATION AND ADD A THIRD FLOORProposed second floor addition and interior alteration to convert the existing single family detached house to a duplex

    Applied Nov 27, 2024 · issued Dec 24, 2024 · Permit 24 175725 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposed second floor addition and interior alteration to convert the existing single family detached house to a duplex

    Applied Jul 5, 2024 · issued Aug 27, 2024 · 2 homes added · Permit 24 175725 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed second floor addition and interior alteration to convert the existing single family detached house to a duplex

    Applied Jul 5, 2024 · issued Aug 27, 2024 · Permit 24 175725 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposed second floor addition and interior alteration to convert the existing single family detached house to a duplex

    Applied Jul 5, 2024 · issued Aug 27, 2024 · Permit 24 175725 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposed second floor addition and interior alteration to convert the existing single family detached house to a duplex

    Applied Jul 5, 2024 · issued Aug 27, 2024 · Permit 24 175725 DRN

    Inspections under way
  • Drains and site services

    Drain - Proposed underpinning and side foundation wall

    Applied Jun 19, 2024 · issued Jun 19, 2024 · Permit 24 146781 DRN

    Permit issued
Show 4 more permits
  • Plumbing

    Plumbing - Proposed underpinning and side foundation wall

    Applied May 10, 2024 · issued Jun 18, 2024 · Permit 24 146781 PLB

    Permit issued
  • Small residential project · Underpinning

    Proposed underpinning and side foundation wall

    Applied May 10, 2024 · issued Jun 11, 2024 · Permit 24 146781 BLD

    Inspections under way
  • Small residential project · Underpinning

    Proposed underpinning and side foundation wall

    Applied May 5, 2024 · completed May 7, 2024 · Permit 24 144216 BLD

    Cancelled
  • Drains and site services

    Drain - Proposed underpinning and side foundation wall

    Applied May 5, 2024 · completed May 7, 2024 · Permit 24 144216 DRN

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To legalize and to maintain a second and third storey addition above the existing dwelling and the conversion into a duplex dwelling. This application is being considered as a new duplex dwelling.

    Decision: Approved (hearing Oct 9, 2025)

    Filed Jul 22, 2025 · File A0278/25EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 65-81 McCormack Street

    12 storeys · 263 homes · Residential

    430 m away · Rezoning · Under appeal · filed Mar 17, 2022

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 380 Weston Rd · Consent

    140 m away · filed Jul 17, 2026 · Accepted

  • 47 Lapp St · Minor variance

    To construct a new laneway suite in the rear yard.

    240 m away · filed May 16, 2023 · Approved

  • 32 Avon Ave · Minor variance

    To enclose the existing stairs in the rear yard. A previous Committee of Adjustment application (A0905/18EYK) approved variances related to the side yard setback, length and depth.

    60 m away · filed Mar 9, 2023 · Approved

  • 114 Northland Ave · Minor variance

    To enclose the existing front porch.

    220 m away · filed Jul 8, 2021 · Approved

  • 36 Cayuga Ave · Minor variance

    To construct a detached garage in the rear yard.

    70 m away · filed Aug 27, 2020 · Approved

  • 84 Cayuga Ave · Minor variance

    To construct a new basement walkout and to construct south and east side additions to the existing detached garage.

    170 m away · filed Aug 6, 2020 · Approved

  • 109 Northland Ave · Minor variance

    To construct a new detached dwelling.

    240 m away · filed Dec 10, 2019 · Approved

  • 346 Weston Rd · Consent

    Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

    200 m away · filed May 29, 2019 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.