Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

39 Summerhill Ave

The City of Toronto has 17 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · New laneway / rear yard suite

    REVISION - revised dwelling suite layoutDemolish existing garage and construct a new two storey laneway suite

    Applied Dec 10, 2021 · issued Dec 21, 2021 · completed Nov 28, 2022 · Permit 20 206333 BLD (revision 01)

    Closed
  • Drains and site services

    Drain - Demolish existing garage and construct a new two storey laneway suite

    Applied Dec 10, 2021 · issued Dec 13, 2021 · completed Dec 22, 2021 · Permit 20 206333 DRN

    Closed
  • Plumbing

    Plumbing - Demolish existing garage and construct a new two storey laneway suite

    Applied Dec 10, 2021 · issued Dec 13, 2021 · completed Nov 24, 2022 · Permit 20 206333 PLB

    Closed
  • Heating and ventilation

    HVAC - Demolish existing garage and construct a new two storey laneway suite

    Applied Dec 10, 2021 · issued Dec 13, 2021 · completed Nov 24, 2022 · Permit 20 206333 HVA

    Closed
  • New house · New building

    REV01: Revison to Permit #20 100078 BLD 00 NH to enlarge the width of the skylight and create a niche for a window in the second floor bathroom.Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall (See Admin Permit 19 237692 SR).

    Applied Sep 2, 2021 · issued Sep 20, 2021 · completed Oct 14, 2022 · Permit 20 100078 BLD (revision 01)

    Closed
  • Heating and ventilation

    REVISION - as per the drawingsHVAC - Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall

    Applied Jan 13, 2021 · issued Jan 25, 2021 · completed Sep 28, 2021 · Permit 20 100078 HVA (revision 01)

    Closed
  • Small residential project · New laneway / rear yard suite

    Demolish existing garage and construct a new two storey laneway suite

    Applied Oct 14, 2020 · issued Sep 14, 2021 · completed Nov 28, 2022 · 1 home added · Permit 20 206333 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall

    Applied Jan 2, 2020 · issued Feb 5, 2020 · completed Sep 28, 2021 · Permit 20 100078 HVA

    Closed
  • Demolition

    Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall

    Applied Jan 2, 2020 · issued Feb 26, 2020 · completed Sep 30, 2020 · 1 home removed · Permit 20 100086 DEM

    Closed
  • Plumbing

    Plumbing - Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall

    Applied Jan 2, 2020 · issued Feb 5, 2020 · completed Sep 28, 2021 · Permit 20 100078 PLB

    Closed
  • Drains and site services

    Drain - Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall

    Applied Jan 2, 2020 · issued Feb 5, 2020 · completed Oct 14, 2022 · Permit 20 100078 DRN

    Closed
  • New house · New building

    Proposal to demolish existing 2.5-storey semi-detached dwelling and replace with new 3-storey semi-detached dwelling, underpin rear portion of shared party wall (See Admin Permit 19 237692 SR).

    Applied Jan 2, 2020 · issued Feb 5, 2020 · completed Oct 14, 2022 · 1 home added · Permit 20 100078 BLD

    Closed
Show 5 more permits
  • Plumbing

    Plumbing - Proposal to remove existing one storey rear addition, replace with new one storey rear addition and underpin rear portion of existing basement

    Applied Oct 17, 2019 · completed Feb 26, 2020 · Permit 19 237686 PLB

    Cancelled
  • Small residential project · Multiple projects

    Proposal to remove existing one storey rear addition, replace with new one storey rear addition and underpin rear portion of existing basement

    Applied Oct 17, 2019 · completed Feb 26, 2020 · Permit 19 237686 BLD

    Cancelled
  • Drains and site services

    Drain - Proposal to remove existing one storey rear addition, replace with new one storey rear addition and underpin rear portion of existing basement

    Applied Oct 17, 2019 · completed Feb 26, 2020 · Permit 19 237686 DRN

    Cancelled
  • Small residential project · Multiple projects

    Basement underpinning, basement walkout and finish basement

    Applied Jun 16, 2010 · issued Jun 22, 2010 · completed Sep 28, 2020 · Permit 10 198176 BLD

    Closed
  • Plumbing

    Plumbing - Basement underpinning, basement walkout and finish basement

    Applied Jun 16, 2010 · issued Jun 22, 2010 · completed Sep 28, 2020 · Permit 10 198176 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a new three-storey semi-detached dwelling and a rear two-storey laneway suite.

    Decision: Approved (hearing Oct 23, 2019)

    Filed Jun 25, 2019 · File A0694/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 9 Woodlawn Avenue East and 1233 Yonge Street

    49 storeys · 724 homes · Mixed use

    150 m away · Site plan · Under review · filed Dec 29, 2021

    Under review
  • 1251-1311 Yonge Street

    47 storeys · 832 homes · Mixed use

    200 m away · Site plan · Under review · filed Apr 12, 2022

    Under review
  • 49 Jackes Avenue

    217 homes · Residential

    230 m away · Condominium · Under review · filed Nov 4, 2021

    Under review
  • 1212-1220 Yonge Street

    22 storeys · 185 homes · Mixed use

    230 m away · Site plan · Under review · filed Aug 31, 2022

    Under review
  • 1196-1210 Yonge Street

    14 storeys · 67 homes · Mixed use

    240 m away · Condominium · Under review · filed Nov 18, 2021

    Under review
  • 44 Price Street

    2 storeys · Not stated in the file

    330 m away · Site plan · Approved · filed Aug 19, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 67 Summerhill Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs.

    80 m away · filed Jul 29, 2026 · Hearing scheduled

  • 1262 Yonge St · Minor variance

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    190 m away · filed Apr 23, 2026 · Approved

  • 1177 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the seven-storey mixed-use condominium building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1, P2, and P3 will be maintained and unaltered. There will be a total of 182 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    130 m away · filed Sep 2, 2025 · Approved

  • 1133 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey commercial building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 40 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    180 m away · filed Jul 11, 2025 · Approved

  • 1155 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey office building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 47 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    140 m away · filed Jul 11, 2025 · Approved

  • 49 Woodlawn Ave E · Minor variance

    To legalize and to maintain the rear ground floor deck, which was constructed without an authorized building permit.

    130 m away · filed Dec 27, 2024 · Approved

  • 38 Mathersfield Dr · Minor variance

    To permit the existing two-storey ancillary building (detached garage abutting the laneway), by constructing a mezzanine on the second level. The existing ancillary structure (storage shed) attached to the detached garage will be maintained.

    220 m away · filed Sep 25, 2024 · Approved

  • 43 Woodlawn Ave E · Minor variance

    To alter the existing two-and-one-half detached dwelling by constructing a rear one-storey corner side (west) addition and a rear two-storey corner side (east) addition (below the existing third storey) with a rear first floor deck, basement extension and basement walkout.

    110 m away · filed Feb 1, 2024 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.