The City of Toronto has 5 building permits since 2017 (4 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for a 2 storey addition at the front, 3rd floor addition, interior alterations and new front porch.

    Applied May 21, 2021 · issued Jun 4, 2021 · Permit 21 159015 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for a 2 storey addition at the front, 3rd floor addition, interior alterations and new front porch.

    Applied May 21, 2021 · issued Jun 4, 2021 · Permit 21 159015 BLD

    Inspections under way
  • Drains and site services

    Drain - Construct (68 lm) of underpinning

    Applied Jul 7, 2016 · issued Jul 20, 2016 · Permit 16 186768 DRN

    Inspections under way
  • Plumbing

    Plumbing - Construct (68 lm) of underpinning

    Applied Jul 7, 2016 · issued Jul 20, 2016 · Permit 16 186768 PLB

    Inspections under way
  • Small residential project · Underpinning

    Construct (68 lm) of underpinning

    Applied Jul 7, 2016 · issued Jul 15, 2016 · completed Feb 22, 2017 · Permit 16 186768 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit a home occupation use.

    Hearing Oct 29, 2026

    Filed Sep 14, 2026 · File A0323/26NY

    Tentatively scheduled
  • Minor variance · R addition

    To construct a third storey over the existing dwelling in conjunction with a two-storey addition to the front of the dwelling. The applicant is also proposing other interior and exterior alterations including a new front porch.

    Decision: Approved (hearing Apr 1, 2021)

    Filed Feb 5, 2021 · File A0071/21NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 101 Livingstone Ave · Minor variance

    To construct a three-storey detached fourplex in conjunction with a two-storey laneway suite at the rear of the property.

    170 m away · filed Sep 2, 2026 · Hearing scheduled

  • 405 Whitmore Ave · Minor variance

    To legalize and maintain the existing detached garage as re-constructed.

    50 m away · filed Jun 16, 2026 · Approved

  • 385 Whitmore Ave · Minor variance

    To construct a new detached dwelling with an integral garage. Please note, this application was previously deferred by the Committee of Adjustment on February 5, 2026.

    30 m away · filed Nov 4, 2025 · Approved

  • 96 Belgravia Ave · Minor variance

    To construct a new two-storey garden suite in the rear yard of the existing three-storey fourplex.

    50 m away · filed Jul 22, 2025 · Refused

  • 65 Livingstone Ave · Minor variance

    To construct a three-storey fourplex and a two-storey laneway suite.

    210 m away · filed Jul 3, 2025 · Approved

  • 96 Belgravia Ave · Minor variance

    To construct a new four unit multiplex.

    50 m away · filed Jan 22, 2025 · Approved

  • 96 Belgravia Ave · Minor variance

    To construct a new three-storey multiplex. Please note a previous application (File # A0469/23NY) with respect to the subject property, was before the Committee of Adjustment on Thursday, March 7, 2024, which was ultimately refused.

    50 m away · filed May 15, 2024 · Refused

  • 405 Whitmore Ave · Minor variance

    To construct a 2nd and 3rd storey addition and a secondary suite in the basement.

    50 m away · filed Nov 22, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.