Toronto address · Ward 13, Toronto Centre
393 Berkeley St
The City of Toronto has 10 building permits since 2017 (7 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
HVAC - Construct a new two storey laneway suite with garage.
Applied Jul 16, 2026 · issued Aug 4, 2026 · Permit 23 201115 HVA (revision 01)
- Permit issued
Heating and ventilation
HVAC - To construct a two storey rear addition, and third floor addition, interior alterations, new basement walkout, new front porch, ground and second floor rear deck and roof deck.
Applied Jun 12, 2026 · issued Jun 26, 2026 · Permit 23 201024 HVA
- Cancelled
Heating and ventilation
HVAC - Construct a new two storey laneway suite with garage
Applied Nov 13, 2025 · issued Nov 27, 2025 · completed Jul 13, 2026 · Permit 23 201115 HVA
- Revision issued
Small residential project · Multiple projects
Revision 01: changes to basement shoring, footing, foundation wall and walkout structural designsTo construct a two storey rear addition, and third floor addition, interior alterations, new basement walkout, new front porch, ground and second floor rear deck and roof deck.
Applied May 13, 2025 · issued May 27, 2025 · Permit 23 201024 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
To construct a two storey rear addition, and third floor addition, interior alterations, new basement walkout, new front porch, ground and second floor rear deck and roof deck.
Applied Sep 12, 2023 · issued Dec 19, 2023 · Permit 23 201024 BLD
- Inspections under way
Small residential project · New laneway / rear yard suite
Construct a new two storey laneway suite with garage
Applied Sep 12, 2023 · issued Dec 18, 2023 · 1 home added · Permit 23 201115 BLD
- Inspections under way
Plumbing
Plumbing - Construct a new two storey laneway suite with garage
Applied Sep 12, 2023 · issued Dec 18, 2023 · Permit 23 201115 PLB
- Inspections under way
Plumbing
Plumbing - To construct a two storey rear addition, and third floor addition, interior alterations, new basement walkout, new front porch, ground and second floor rear deck and roof deck.
Applied Sep 12, 2023 · issued Dec 19, 2023 · Permit 23 201024 PLB
- Closed
Small residential project · Fire damage
Structural repairs due to fire damage
Applied Mar 22, 2017 · issued Apr 5, 2017 · completed Dec 4, 2017 · Permit 17 132669 BLD
- Closed
Small residential project · Multiple projects
Proposal to construct 1 sty rear addition, underpinning basement, reconstruct 3rd floor deck, and repair guards on roof deck, and reconstruct rear basement walkout in 4 unit dwelling. See work orders and court case.
Applied Jul 29, 2014 · issued Aug 16, 2021 · completed Dec 22, 2023 · Permit 14 198302 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-and-one-half-storey detached dwelling by constructing rear one and two-storey additions with a ground floor patio, a rear walkout basement, a rear second storey deck, and a partial third storey addition with a deck. Also, to construct a two-storey ancillary building (detached garage with a laneway suite) in the rear yard, abutting the laneway.
Decision: Approved (hearing Oct 26, 2022)
Filed Apr 7, 2022 · File A0464/22TEY
- Accepted
Minor variance · Other
CONSTRUCTION OF TWO STOREY LANEWAY SUITE (Height = 6.12m, Total Floor Area Above Grade = 156.63m2)
Filed Apr 7, 2022 · File A0466/22TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
10 storeys · 60 homes · Mixed use
170 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
11 storeys · Mixed use
240 m away · Site plan · Under review · filed May 26, 2026
- Under review
107 homes · Residential
280 m away · Condominium · Under review · filed Oct 27, 2021
- Under review
591 Dundas Street East and 325 Gerrard Street East
26 storeys · 271 homes · Non-residential
300 m away · Site plan · Under review · filed Jan 13, 2025
- Under review
10 storeys · 60 homes · Mixed use
310 m away · Site plan · Under review · filed Jul 4, 2025
- Now selling
Neighbours’ Committee of Adjustment files within 250 m
380 Berkeley St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) two storey addition. Also, to construct rear ground floor and second storey bay windows, a rear second storey balcony, and a rear third storey rooftop pergola and terrace extension (above the second storey roof).
50 m away · filed Apr 16, 2026 · Approved
183 Carlton St · Minor variance
To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).
190 m away · filed Apr 10, 2026 · Approved
388 Berkeley St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor stair landing, and a side (south) basement walkout. The existing basement walkout and rear deck with be demolished, and a portion of the rear second storey roof will be reconstructed. Also, to construct one additional parking space (for a total of two parking spaces), abutting the laneway.
40 m away · filed Jan 12, 2026 · Approved
209 Carlton St · Minor variance
To alter the existing three-storey semi-detached building (currently vacant and with the front and rear portion of the building, abutting Doctor O Lane, attached below grade) by converting it to a mixed-use building (service hub for the Indigenous community) with four dwelling units and community and office space on the basement, first, and second floors, by constructing front and side (west) basement additions, an enlarged ground floor terrace (at the west portion of the building), three new dormers at the rear portion of the second floor, and a rear second floor balcony at the east portion…
80 m away · filed May 27, 2025 · Approved
215 Carlton St · Minor variance
To alter the existing mixed-use three-storey semi-detached building by constructing a rear three-storey addition with a first level deck and staircase, and a green roof. Also, to construct a covered ground floor deck with a walkout basement on the east side wall of the existing building. There will be a total of 2 commercial units and 8 residential dwelling units on this lot.
50 m away · filed Jan 8, 2025 · Approved
454 Parliament St · Minor variance
To continue to permit the use of the existing rear second storey rooftop deck/terrace as part of the existing restaurant.
70 m away · filed Dec 24, 2024 · Approved
20 Aberdeen Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.
180 m away · filed Sep 4, 2024 · Approved
194 Carlton St · Minor variance
To convert the existing two-and-one-half-storey semi-detached mixed-use building into a three-unit dwelling (triplex).
180 m away · filed Jul 5, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.