The City of Toronto has 6 building permits since 2017 and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision 01- HVAC - PROPOSED: RENOVATE BASEMENT, GROUND AND SECOND FLOOR WITH SMALL ADDITION AT REAR. ADD THIRD FLOOR AND BALCONY. NEW DETACHED GARAGE AT REAR LANE.

    Applied Nov 1, 2021 · issued Nov 26, 2021 · completed May 9, 2022 · Permit 20 185029 HVA (revision 01)

    Closed
  • Small residential project · Multiple projects

    Revision 01- PROPOSED: RENOVATE BASEMENT, GROUND AND SECOND FLOOR WITH SMALL ADDITION AT REAR. ADD THIRD FLOOR AND BALCONY. NEW DETACHED GARAGE AT REAR LANE.

    Applied Nov 1, 2021 · issued Dec 10, 2021 · completed Jun 15, 2022 · Permit 20 185029 BLD (revision 01)

    Closed
  • Heating and ventilation

    Hvac - proposed: renovate basement, ground and second floor with small addition at rear. Add third floor and balcony. New detached garage at rear lane.

    Applied Aug 25, 2020 · issued Oct 13, 2020 · completed May 9, 2022 · Permit 20 185029 HVA

    Closed
  • Plumbing

    Plumbing - PROPOSED: RENOVATE BASEMENT, GROUND AND SECOND FLOOR WITH SMALL ADDITION AT REAR. ADD THIRD FLOOR AND BALCONY. NEW DETACHED GARAGE AT REAR LANE.

    Applied Aug 25, 2020 · issued Oct 13, 2020 · completed May 9, 2022 · Permit 20 185029 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed: renovate basement, ground and second floor with small addition at rear. Add third floor and balcony. New detached garage at rear lane.

    Applied Aug 25, 2020 · issued Oct 13, 2020 · completed Jun 15, 2022 · 1 home added · Permit 20 185029 BLD

    Closed
  • Drains and site services

    Drain - PROPOSED: RENOVATE BASEMENT, GROUND AND SECOND FLOOR WITH SMALL ADDITION AT REAR. ADD THIRD FLOOR AND BALCONY. NEW DETACHED GARAGE AT REAR LANE.

    Applied Aug 25, 2020 · issued Oct 13, 2020 · completed May 9, 2022 · Permit 20 185029 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey detached dwelling by reconstructing the rear basement walkout, and constructing a rear ground floor deck, front second storey balcony and a third storey addition. A new rear yard detached garage will also be constructed.

    Decision: Approved (hearing Jul 22, 2020)

    Filed Jan 25, 2020 · File A0078/20TEY

    Closed
  • Minor variance · NR addition

    To alter the existing two-storey detached dwelling by reconstructing the front porch, the rear first storey deck, rear basement walkout, and rear detached garage, and constructing a front second storey balcony and a third storey addition with a rear balcony.

    Decision: Refused (hearing Nov 6, 2019)

    Filed Mar 7, 2019 · File A0247/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 422 Clinton St · Minor variance

    To construct a new two-storey detached ancillary building (containing one laneway suite), with a covered entrance (the second storey will be cantilevered at the west portion of the building). The existing detached garage in the rear yard will be demolished. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, which is currently under construction (as approved under Minor Variance Decision A0619/24TEY), and one unit within the ancillary building).

    80 m away · filed Aug 14, 2025 · Approved

  • 684 Manning Ave · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with front and rear stairs (providing access to the ground level), front and rear second and third storey balconies, a rear waste bin enclosure, and two bicycle parking spaces. The existing rear one-storey ancillary building (detached garage, abutting the laneway) will be maintained and unaltered. There will be a total of four residential dwelling units on this lot.

    60 m away · filed May 1, 2025 · Approved

  • 151 Barton Ave · Minor variance

    To alter the existing two-storey semi-detached building (containing one commercial unit and two residential dwelling units) by constructing a front patio, abutting Barton Avenue. Also, to permit an eating establishment use on this site.

    230 m away · filed Apr 22, 2025 · Approved

  • 699 Bloor St W · Minor variance

    To alter the existing three-storey mixed-use building by reconstructing the rear second storey addition, and to construct a rear third storey covered terrace (above the new second storey addition). There will be one eating establishment that will occupy the ground floor and basement, and three residential dwelling units that will occupy the second and third floors of this building.

    160 m away · filed Nov 4, 2024 · Approved

  • 422 Clinton St · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with front and rear porches, front and rear basement walkouts, front and rear second storey balconies, and a front third storey balcony. The existing two-and-one-half-storey detached dwelling will be demolished. The existing garage in the rear yard, accessed from the rear lane, will be maintained and unaltered.

    80 m away · filed Jul 17, 2024 · Approved

  • 91 Barton Ave · Minor variance

    To construct a new three-storey, nine-unit, apartment building with front and rear ground floor decks and sunken terraces, front and rear basement walkouts, an east side porch, front and rear, second and third storey balconies, two east side third storey balconies, and two rooftop patios. Also, to construct a new two-storey ancillary building (containing two laneway suites), in the rear yard, abutting Ciamaga Lane. The existing ancillary building (detached garage) will be demolished.

    240 m away · filed May 16, 2024 · Refused

  • 91 Barton Ave · Minor variance

    To construct a new three-storey, eight-unit, apartment building with front and rear first, second and third storey balconies, and four rooftop patios. Also, to construct a new two-storey ancillary building (to contain two laneway suites), in the rear yard, abutting Ciamaga Lane. The existing ancillary building (detached garage) will be demolished.

    240 m away · filed Feb 6, 2024 · Refused

  • 708 Euclid Ave · Minor variance

    To convert the existing three-storey detached dwelling from three units to four units by constructing a complete third storey addition with a third storey rear balcony and a partial fourth storey addition with an accessible rooftop terrace. Also, to construct new front stairs in the front yard of the property.

    160 m away · filed Jan 31, 2022 · Withdrawn

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.