Toronto address · Ward 5, York South-Weston
395 Kane Ave
The City of Toronto has 9 building permits since 2017 (7 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Revision 03: Revision to permit, no attic in front extension/ Covered and conditioned Attic in existing building/ Cathedral ceiling in the back extension on 2nd floor/ Spray foam insulation across the exterior walls, attic, foundation walls in the basement, Double door and triangle shaped windows on the back wall of 2nd floor extension/ Change of washer and dryer in 2nd floor and basement/ Mechanical room change from front to back basement/ Change of window from south to north
Applied May 6, 2026 · issued Jul 17, 2026 · Permit 22 139384 BLD (revision 03)
- Revision issued
Small residential project · Multiple projects
Rev 02 - Basement underpinning to 8ft at the back under the kitchen by removing the crawl space & back extension foundation to 8ft for storage space; front steps changed from wood/concrete pillars to all concrete steps
Applied Feb 5, 2024 · issued Mar 15, 2024 · Permit 22 139384 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
Rev 01 - Basement door in the front moves to the south side, main floor door moves to the north side, added six large windows on the main floor & second floor, add washer/dryer on the second floor near to the new big washroom, parking pad in front of the house beside the stairs, and added attic windowProposal for front and rear additions and underpinning to an existing two storey single family detached dwelling.
Applied Aug 24, 2023 · issued Sep 22, 2023 · Permit 22 139384 BLD (revision 01)
- Inspections under way
Drains and site services
Drain - Proposal for front and rear additions and underpinning to an existing two storey single family detached dwelling.
Applied Aug 18, 2022 · issued Mar 27, 2023 · Permit 22 139384 DRN
- Inspections under way
Plumbing
Plumbing - Proposal for front and rear additions and underpinning to an existing two storey single family detached dwelling.
Applied Aug 18, 2022 · issued Mar 27, 2023 · Permit 22 139384 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for front and rear additions and underpinning to an existing two storey single family detached dwelling.
Applied Apr 28, 2022 · issued Mar 27, 2023 · Permit 22 139384 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for front and rear additions and underpinning to an existing two storey single family detached dwelling.
Applied Apr 28, 2022 · issued Mar 27, 2023 · Permit 22 139384 HVA
- Cancelled
Small residential project · Addition(s)
Proposed front addition and 2-storey addition in the rear of the existing single family detached dwelling.
Applied Feb 25, 2020 · completed Mar 16, 2020 · Permit 20 118921 BLD
- Closed
Designated structure · Solar collector
roof mounted solar collector
Applied Mar 24, 2014 · issued Jun 9, 2014 · completed Jul 7, 2026 · Permit 14 132226 DST
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To construct a two-storey front addition, a one-storey rear addition, a new front porch, a new rear yard deck, and a front and rear parking space.
Decision: Approved (hearing May 25, 2021)
Filed Nov 10, 2020 · File A0440/20EYK
What’s planned nearby
Development sites within 500 m
- Under appeal
45 storeys · 500 homes · Mixed use
120 m away · Rezoning · Under appeal · filed Mar 4, 2024
- Under appeal
2636-2654 Eglinton Avenue West and 1856 Keele Street
33 storeys · 370 homes · Mixed use
370 m away · Site plan · Under appeal · filed Dec 22, 2022
- Under review
24 storeys · 272 homes · Mixed use
370 m away · Site plan · Under review · filed Nov 24, 2021
Neighbours’ Committee of Adjustment files within 250 m
33 Venn Cres · Minor variance
To construct a new detached fourplex.
190 m away · filed Mar 3, 2026 · Deferred
33 Venn Cres · Consent
To obtain consent to sever the lot into three residential lots, one of which is undersized.
190 m away · filed Mar 3, 2026 · Deferred
33 Venn Cres · Minor variance
To construct a new semi-detached fourplex.
190 m away · filed Mar 3, 2026 · Deferred
33 Venn Cres · Minor variance
To construct a new semi-detached fourplex.
190 m away · filed Mar 3, 2026 · Deferred
556 Silverthorn Ave · Minor variance
To construct two-storeys over the existing dwelling and two-storey rear addition with a terrace on top.
150 m away · filed Feb 26, 2025 · Approved
15 Holwood Ave · Minor variance
To legalize and to maintain the existing secondary suite and to construct a front walkout.
190 m away · filed Jul 28, 2023 · Approved
42 Holwood Ave · Minor variance
To convert the existing garage into habitable space.
220 m away · filed Feb 14, 2023 · Approved
149 Cameron Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new front porch and a new detached garage.
180 m away · filed Feb 7, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.