Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

3975 Keele St

The City of Toronto has 12 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Other

    Existing single storey office building sani line is end of life and needs to be replaced. Civil design to minimise site disruptions with the replacement of a new sani line connecting to existing city structure at property line. No new fixtures or changes in the existing design flows proposed (all exisitng).

    Applied Aug 28, 2024 · issued Sep 11, 2024 · completed Jan 22, 2025 · Permit 24 205168 PSA

    Closed
  • Drains and site services · Site service

    To replace sanitary line to existing Office building, civil design to minimise site distruptions with the replacement of a new sani line connecting to existing city structure at property line. No new fixture changes int eh existing design flows

    Applied Jul 31, 2024 · issued Sep 11, 2024 · completed Jan 22, 2025 · Permit 24 190736 STS

    Closed
  • Drains and site services · Site service

    Proposed this project will extend the existing foam line to the rail car facility and exend the existing fire water line to berm B to allow for fire fighting in event of a fire scenario.

    Applied May 18, 2021 · issued Sep 16, 2021 · Permit 21 156664 STS

    Permit issued
  • New building

    Electrical Substation - E-House will be fabricated off-site and shipped as a self contained module. E-House will then sit on top of new structural steel support and new foundations.

    Applied Jul 29, 2015 · issued Aug 20, 2015 · completed Jan 19, 2017 · Permit 15 198971 BLD

    Closed
  • Heating and ventilation

    Revision 02 - Change to type of hvac unitRevision to HVAC - Shell Canada - Keele Distribution Terminal

    Applied Jun 4, 2013 · issued Jul 9, 2013 · completed Jul 20, 2026 · Permit 13 112759 HVA (revision 02)

    Closed
  • Heating and ventilation

    Revision to HVAC - Shell Canada - Keele Distribution Terminal

    Applied Mar 22, 2013 · issued Apr 15, 2013 · completed Jul 20, 2026 · Permit 13 112759 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision to Shell Canada - Keele Distribution Terminal - Relocate partition wall in computer room.

    Applied Mar 22, 2013 · issued Apr 9, 2013 · completed Aug 14, 2025 · Permit 13 112759 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Shell Canada - Keele Distribution Terminal - Convert storage into computer room

    Applied Jan 29, 2013 · issued Feb 26, 2013 · completed Jul 20, 2026 · Permit 13 112759 HVA

    Closed
  • Addition or alteration · Interior alterations

    Shell Canada - Keele Distribution Terminal - Convert storage into computer room

    Applied Jan 29, 2013 · issued Feb 4, 2013 · completed Aug 14, 2025 · Permit 13 112759 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Install one backflow preventre

    Applied May 11, 2011 · issued Jun 1, 2011 · completed Jun 23, 2026 · Permit 11 192522 PSA

    Closed
  • Drains and site services · Site service

    Finch West Station TTC - Relocate 200mm Sanitary sewer

    Applied Sep 28, 2010 · issued Nov 10, 2010 · completed Jun 8, 2026 · Permit 10 267001 STS

    Closed (dormant)
  • Drains and site services · Inside and outside drains

    Drain - Construct a new building for operating ethanol unloading facility

    Applied May 11, 2006 · issued May 25, 2006 · Permit 05 204282 STS

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.