Toronto address · Ward 6, York Centre
4 Deverell Cres
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to demolish existing dwelling and construct a new 2 storey single family dwelling with integral garage, basement walkout stairs, rear deck, covered front porch and second floor balcony
Applied Jun 24, 2022 · issued Jul 19, 2022 · completed Feb 28, 2025 · Permit 22 166896 HVA
- Closed
Plumbing
Plumbing - Proposal to demolish existing dwelling and construct a new 2 storey single family dwelling with integral garage, basement walkout stairs, rear deck, covered front porch and second floor balcony
Applied Jun 23, 2022 · issued Jul 19, 2022 · completed Feb 28, 2025 · Permit 22 166896 PLB
- Closed
New house · New building
Proposal to demolish existing dwelling and construct a new 2 storey single family dwelling with integral garage, basement walkout stairs, rear deck, covered front porch and second floor balcony
Applied Jun 23, 2022 · issued Jul 19, 2022 · completed May 21, 2026 · 1 home added · Permit 22 166896 BLD
- Closed
Demolition
Proposal to demolish existing dwelling and construct a new 2 storey single family dwelling with integral garage, basement walkout stairs, rear deck, covered front porch and second floor balcony
Applied Jun 23, 2022 · issued Jul 19, 2022 · completed Feb 27, 2025 · 1 home removed · Permit 22 166924 DEM
- Closed
Drains and site services
Drain - Proposal to demolish existing dwelling and construct a new 2 storey single family dwelling with integral garage, basement walkout stairs, rear deck, covered front porch and second floor balcony
Applied Jun 23, 2022 · issued Jul 19, 2022 · completed Feb 28, 2025 · Permit 22 166896 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new dwelling.
Decision: Approved (hearing Apr 28, 2022)
Filed Feb 3, 2022 · File A0099/22NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
22 Deverell Cres · Minor variance
To construct a two-storey ancillary building, containing a garden suite, in the rear yard of the property.
140 m away · filed Aug 20, 2026 · Hearing scheduled
126 Anthony Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage and a front porch.
130 m away · filed Jun 13, 2025 · Approved
138 Anthony Rd · Minor variance
Proposal to construct a new two-storey dwelling.
90 m away · filed Feb 17, 2022 · Approved
129 Anthony Rd · Minor variance
To construct a new attached garage to existing dwelling.
80 m away · filed Jan 21, 2022 · Approved
26 Deverell Cres · Minor variance
To construct a second floor addition.
150 m away · filed Aug 16, 2019 · Approved
9 Deverell Cres · Minor variance
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with a one-storey addition. The applicant is also proposing other interior and exterior alterations.
60 m away · filed Apr 4, 2019 · Approved
144 Winston Park Blvd · Consent
To obtain consent to sever the property into two undersized residential lots. Please note, this file was deferred on September 26th, 2019 in order to allow the applicant the opportunity to speak with City Planning and to conduct community consultation.
80 m away · filed Mar 11, 2019 · Refused
144 Winston Park Blvd · Minor variance
To construct a new semi-detached dwelling. Please note, this file was deferred on September 26th, 2019 in order to allow the applicant the opportunity to speak with City Planning and to conduct community consultation.
80 m away · filed Mar 11, 2019 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.