Toronto address · Ward 23, Scarborough North
4 Fieldside Dr
The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - This is a detached 3 bedroom house. As part of this project, there will be extension at the back of the house. andcreate basement apartment
Applied Jan 2, 2024 · issued Jun 20, 2025 · Permit 24 100287 HVA
- Permit issued
Plumbing
Plumbing - This is a detached 3 bedroom house. As part of this project, there will be extension at the back of the house. andcreate basement apartment
Applied Jan 2, 2024 · issued Jun 20, 2025 · Permit 24 100287 PLB
- Permit issued
Small residential project · Addition(s)
This is a detached 3 bedroom house. As part of this project, there will be extension at the back of the house. and create basement apartment
Applied Jan 2, 2024 · issued Jun 20, 2025 · 1 home added · Permit 24 100287 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter to the existing two-storey detached dwelling with a secondary suite by constructing a second-storey rear addition and rear balcony. This application was previously deferred at the January 16, 2025 hearing.
Decision: Approved (hearing Apr 9, 2025)
Filed Oct 25, 2024 · File A0259/24SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
70 Longsword Dr · Minor variance
To alter the existing two-storey dwelling by constructing a one-storey rear addition with a rear deck.
50 m away · filed Dec 9, 2025 · Approved
127 Ashridge Dr · Minor variance
To construct a new dwelling.
170 m away · filed Nov 2, 2022 · Approved
127 Ashridge Dr · Minor variance
To construct a new dwelling.
170 m away · filed Apr 21, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.