Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

4 Stephenson Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed interior alterations to remove and construct non load-bearing walls on the main floor

    Applied May 27, 2020 · issued Jun 4, 2020 · completed Oct 23, 2020 · Permit 20 140387 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to remove and construct non load-bearing walls on the main floor

    Applied May 27, 2020 · issued May 27, 2020 · completed Jan 27, 2021 · Permit 20 140387 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed interior alterations to remove and construct non load-bearing walls on the main floor

    Applied Apr 29, 2020 · issued May 20, 2020 · completed Jan 27, 2021 · Permit 20 140387 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 29 Iona Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a basement addition below.

    240 m away · filed May 12, 2026 · Approved

  • 72 Keystone Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front three-storey addition, a new front porch with canopy, a rear two-storey addition, a partial third storey addition with a rear balcony (above the rear two-storey addition), and a rear ground floor deck.

    70 m away · filed Mar 31, 2026 · Deferred

  • 143 Oakcrest Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    200 m away · filed Dec 3, 2025 · Postponed

  • 10 Oak Park Ave · Minor variance

    To construct a new two-storey ancillary building (garden suite) in the rear yard.

    190 m away · filed Mar 14, 2024 · Approved

  • 8 Oak Park Ave · Minor variance

    To construct a new two-storey ancillary building (garden suite), in the rear yard of the existing two-storey semi-detached dwelling. The existing one-storey detached garage in the rear yard will be demolished.

    190 m away · filed Jan 12, 2024 · Approved

  • 10 Patricia Dr · Minor variance

    To alter the existing two-storey semi-detached dwelling by partially enclosing the existing covered front porch. Also, to construct a new covered porch to replace the remaining area, front porch stairs, and a front ground floor bay window.

    240 m away · filed Jul 4, 2023 · Approved

  • 28 Morton Rd · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing the front porch canopy and the second storey, and to construct a rear two-storey addition with a rear ground floor deck and a second storey balcony.

    70 m away · filed Aug 7, 2022 · Approved

  • 11 Gledhill Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a fourth storey staircase enclosure in order to access a rooftop deck, and a rear exterior staircase from the second to ground level.

    220 m away · filed Mar 11, 2022 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.