Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

40 Berryman St

The City of Toronto has 13 building permits since 2017 (6 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    REV01: Proposed revision minor partition changes as bubbled on the drawings.Proposal to construct a new detached single family dwelling with three storey and with integral garage with two level below grade

    Applied Sep 16, 2026 · Permit 20 123642 BLD (revision 01)

    Under review
  • Alternative solution

    The alternative solution is considered to achieve the level of performance in the basements as required by the applicable acceptable solution with respect to OBC 3.2.1.4 and 3.2.2.15. The proposed alternative solution is provided in the LRI Engineering Inc. report of July 30, 2020 (Revised Oct 7 2020).

    Applied Aug 7, 2020 · completed Oct 27, 2020 · Permit 20 177583 ALT

    Approved
  • Plumbing

    Plumbing - Proposal to construct a new detached single family dwelling with three storey and with integral garage in the existing vacant lot.

    Applied Mar 9, 2020 · issued Dec 2, 2025 · Permit 20 123642 PLB

    Inspections under way
  • Drains and site services

    Drain - Two sump pumps and one backwater valve. Proposal to construct a new detached single family dwelling with three storey and with integral garage in the existing vacant lot. 2 Level of basements.

    Applied Mar 9, 2020 · issued Dec 2, 2025 · Permit 20 123642 DRN

    Inspections under way
  • New house · New building

    Proposal to construct a new detached single family dwelling with three storey and with integral garage with two level below grade

    Applied Mar 9, 2020 · issued May 28, 2021 · 1 home added · Permit 20 123642 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new detached single family dwelling with three storey and with integral garage in the existing vacant lot. Including 2 Levels of basement.

    Applied Mar 9, 2020 · issued May 28, 2021 · Permit 20 123642 HVA

    Inspections under way
  • Plumbing

    Revision 01 - plumbing changesPlumbing - To construct a new three-storey detached dwelling.

    Applied Feb 21, 2018 · issued Feb 21, 2018 · completed Mar 19, 2021 · Permit 14 241572 PLB (revision 01)

    Cancelled
  • Heating and ventilation

    Revision 01 - changes to mechanicalHVAC - To construct a new three-storey detached dwelling.

    Applied Feb 21, 2018 · issued Mar 2, 2018 · completed Mar 19, 2021 · Permit 14 241572 HVA (revision 01)

    Cancelled
  • New house · New building

    REV 01: Revision to all floors for additional floor area and interior alterationsTo construct a new three-storey detached dwelling with finished basement and basement level terrace.

    Applied Dec 21, 2017 · issued Feb 20, 2018 · completed Mar 19, 2021 · Permit 14 241572 BLD (revision 01)

    Cancelled
  • Heating and ventilation

    HVAC - To construct a new three-storey detached dwelling.

    Applied Oct 22, 2014 · issued Nov 26, 2015 · completed Mar 19, 2021 · Permit 14 241572 HVA

    Cancelled
  • New house · New building

    To construct a new three-storey detached dwelling with finished basement and basement level terrace.

    Applied Oct 22, 2014 · issued Nov 26, 2015 · completed Mar 19, 2021 · 1 home added · Permit 14 241572 BLD

    Cancelled
  • Plumbing

    Plumbing - To construct a new three-storey detached dwelling.

    Applied Oct 22, 2014 · issued Nov 26, 2015 · completed Mar 19, 2021 · Permit 14 241572 PLB

    Cancelled
Show 1 more permit
  • Drains and site services

    Drain - To construct a new three-storey detached dwelling.

    Applied Oct 22, 2014 · issued Nov 26, 2015 · completed Mar 19, 2021 · Permit 14 241572 DRN

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new three-storey detached dwelling with an integral garage, two basement levels, a rear terrace, rear second and third storey balconies, and a front second storey balcony.

    Decision: Approved (hearing Sep 26, 2019)

    Filed Apr 24, 2019 · File A0438/19TEY

    Closed
  • Minor variance · New R building

    To construct a new three-storey detached dwelling with integral garage.

    Decision: Refused (hearing Sep 7, 2016)

    Filed Apr 29, 2016 · Appeal: OMB approved · File A0488/16TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 131 Davenport Rd · Minor variance

    To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).

    110 m away · filed Jul 13, 2026 · Hearing scheduled

  • 106 Scollard St · Minor variance

    To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.

    190 m away · filed Mar 19, 2026 · Approved

  • 80 Scollard St · Minor variance

    To permit a massage therapy use on a portion of the ground floor area of the three-storey mixed-use building. The existing recreation use (pilates studio occupying the basement floor), office units (occupying the remaining portion of the ground floor, and the entire second floor), and one residential dwelling unit (occupying the entire third floor) will be maintained and unaltered.

    210 m away · filed Mar 12, 2026 · Approved

  • 3 New St · Minor variance

    To alter the existing three-storey building by constructing a rear third storey addition (converting the existing third floor balcony into habitable space), a complete fourth storey addition with a front balcony (above the third floor), and a rooftop mechanical unit with screening. The existing integral two-car garage will be maintained and unaltered. This building which used to contain commercial / live-work use will only contain residential use.

    100 m away · filed Mar 6, 2026 · Approved

  • 100 Davenport Rd · Minor variance

    To alter the development standards for the approved 19-storey mixed-use building with 46 dwelling units (as approved under Site Specific Zoning By-law 1578-2025 (OLT)), by revising the maximum building heights and permitted height projections (overall building height and number of storeys remain unchanged at 19 storeys, 66 m, plus a 6 m mechanical penthouse), modifying the required minimum building setbacks, and increasing the maximum permitted total gross floor area and residential gross floor area. There will be a total of 46 residential dwelling units on this lot. A related Site Plan Contr…

    170 m away · filed Oct 21, 2025 · Approved

  • 105 Scollard St · Minor variance

    To increase the indoor seating capacity from 28 seats to 44 seats. Also, to maintain the outdoor patio seating capacity of 44 seats.

    230 m away · filed Nov 13, 2024 · Refused

  • 19 Bishop St · Minor variance

    To alter the existing three-storey row house dwelling (currently under construction, as approved under Minor Variance Application A0239/22TEY) by replacing a sloped portion of the roof with a flat portion.

    40 m away · filed Sep 16, 2024 · Approved

  • 11 Bishop St · Minor variance

    To alter the existing one-storey ancillary building (detached garage located in the side (west) yard (fronting Bishop Street)), by constructing a complete second storey addition, which will connect to the second storey of the main dwelling.

    60 m away · filed Aug 16, 2024 · Application withdrawn

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.