The City of Toronto has 17 building permits since 2017 (12 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Sprinklers

    Proposal to upgrade the existing fire protection system to meet the requirements for the manufacturing of plastic goods

    Applied Sep 4, 2019 · issued Nov 22, 2019 · Permit 19 216070 FSU

    Permit issued
  • Addition or alteration · Other

    construct new concrete pit inside industrial building

    Applied Oct 30, 2018 · issued Nov 12, 2018 · completed Feb 5, 2019 · Permit 18 249900 BLD

    Closed
  • Plumbing

    Plumbing - construct new concrete pit inside industrial building

    Applied Oct 30, 2018 · issued Nov 26, 2018 · completed Jan 17, 2019 · Permit 18 249900 PLB

    Closed
  • Addition or alteration · Interior alterations

    Provide a structural support for cogeneration piping utiliites, attaching to existing building columns

    Applied May 9, 2017 · issued Jun 8, 2017 · Permit 17 157009 BLD

    Permit issued
  • Plumbing · Backflow prevention devices (Water only)

    New fire back-flow preventer as part of water main relocation.

    Applied Mar 29, 2017 · issued Apr 3, 2017 · completed May 1, 2017 · Permit 17 136174 PSA

    Closed
  • Addition or alteration · Other

    Revision 01: Revised structural drawingsProposal to construct a concrete pad to support electrical conduits

    Applied Feb 15, 2017 · issued Mar 16, 2017 · Permit 16 265008 BLD (revision 01)

    Revision issued
  • Addition or alteration · Other

    Proposal to construct a concrete pad to support electrical conduits

    Applied Dec 15, 2016 · issued Jan 16, 2017 · Permit 16 265008 BLD

    Inspections under way
  • Drains and site services · Site service

    Revision 01: abandonment of existing 24.2m domestic water and 24.2 fire water services and installation of new 25m length fire and new 25m length domestic water services from the property line to the existing building due to a break in the existing service line.Removal and replacement of 24.2m existing domestic and fire water services from property line to the existing building due to a break in the existing service line

    Applied Dec 5, 2016 · issued Dec 8, 2016 · completed Apr 19, 2017 · Permit 16 251596 STS (revision 01)

    Closed
  • Drains and site services · Site service

    Removal and replacement of 24.2m existing domestic and fire water services from property line to the existing building due to a break in the existing service line

    Applied Nov 15, 2016 · issued Nov 16, 2016 · completed Apr 19, 2017 · Permit 16 251596 STS

    Closed
  • Fire and security upgrade · Multiple projects

    replace fire alarm panel and add sprinklers to duct, silo and mezzanine

    Applied Aug 12, 2014 · issued Sep 10, 2014 · Permit 14 204804 FSU

    Permit issued
  • Addition or alteration · Other

    Framing for air makeup unit and new duct to roof.

    Applied Dec 19, 2012 · issued Jan 8, 2013 · Permit 12 295999 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Framing for air makeup unit and new duct to roof.

    Applied Dec 19, 2012 · issued Feb 26, 2016 · Permit 12 295999 HVA

    Inspections under way
Show 5 more permits
  • Heating and ventilation

    Revision #1: Changes made to make up air and direction of ductwork.HVAC - Proposed duct collector to be installed at existing industrial manufacturing plant.

    Applied Jun 15, 2012 · issued Sep 10, 2013 · Permit 11 179842 HVA (revision 01)

    Revision issued
  • Heating and ventilation · Special ventilation system

    Proposed installation of exhaust hood system above press machinery in existing instustrial plant.

    Applied Jul 5, 2011 · issued Jul 13, 2011 · Permit 11 232514 MSA

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposed foundations for two indoor storage silos and for exterior dust collector.

    Applied Apr 26, 2011 · Permit 11 179842 FSU

    Application on hold
  • Heating and ventilation

    HVAC - Proposed duct collector to be installed at existing industrial manufacturing plant.

    Applied Apr 20, 2011 · issued May 6, 2011 · Permit 11 179842 HVA

    Inspections under way
  • Addition or alteration · Other

    Proposed foundations for two indoor storage silos and for exterior dust collector.

    Applied Apr 20, 2011 · issued May 6, 2011 · Permit 11 179842 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 500 Fenmar Drive

    Residential

    130 m away · Site plan · Approved · filed Apr 16, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 500 Fenmar Dr · Minor variance

    To construct a mixed-use building.

    130 m away · filed Oct 6, 2023 · Approved

Everything planned in Humber River-Black Creek

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.