Toronto address · Ward 5, York South-Weston
41 Floral Pkwy
The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building
Proposal to construct new two-storey single family detached dwelling with detached garage at rear.
Applied Mar 16, 2016 · issued Apr 7, 2016 · 1 home added · Permit 16 128622 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct new two-storey single family detached dwelling with detached garage at rear. See related files 15-222360 ZZC and C of A file A689/15EYK.
Applied Mar 16, 2016 · issued Apr 7, 2016 · Permit 16 128622 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct new two-storey single family detached dwelling with detached garage at rear. See related files 15-222360 ZZC and C of A file A689/15EYK.
Applied Mar 16, 2016 · issued Apr 7, 2016 · Permit 16 128622 HVA
- Inspections under way
Drains and site services
Drain - Proposal to construct new two-storey single family detached dwelling with detached garage at rear. See related files 15-222360 ZZC and C of A file A689/15EYK.
Applied Mar 16, 2016 · issued Apr 7, 2016 · Permit 16 128622 DRN
- Closed
Demolition
Proposal to demolish existing single family detached dwelling. See related file 16-128622 BLD.
Applied Mar 16, 2016 · issued Apr 7, 2016 · completed Oct 30, 2020 · 1 home removed · Permit 16 128633 DEM
- Inspections under way
Small residential project · Multiple projects
sunroom addition and deck
Applied Aug 24, 2005 · issued Aug 24, 2005 · Permit 05 174181 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
30 storeys · 418 homes · Mixed use
410 m away · Site plan · Approved · filed Dec 17, 2021
Neighbours’ Committee of Adjustment files within 250 m
210 Cornelius Pkwy · Minor variance
To construct a one-storey rear addition, exterior alterations to the existing dwelling and a new detached garage.
120 m away · filed Nov 18, 2024 · Approved
45 Floral Pkwy · Minor variance
To construct a one-storey rear and east side addition.
20 m away · filed Sep 29, 2024 · Approved
97 MacLeod St · Minor variance
To legalize and to maintain an existing one-storey addition along the north side of the existing dwelling.
160 m away · filed Sep 26, 2024 · Approved
104 Jay St · Minor variance
To construct a two-storey north side addition, a new rear deck, a proposed new rear cabana and inground swimming pool.
250 m away · filed Aug 13, 2023 · Approved
119 Jay St · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed May 5, 2023 · Approved
212 Cornelius Pkwy · Minor variance
To legalize and maintain the dwelling that is currently under construction. A previous Committee of Adjustment application (A0360/20EYK) approved variances related to lot area, front yard setback, side yard setback and rear yard setback.
120 m away · filed Apr 27, 2023 · Approved
212 Cornelius Pkwy · Minor variance
To legalize and maintain the dwelling that is currently under construction. A previous Committee of Adjustment application (A0359/20EYK) approved variances related to lot area, front yard setback, side yard setback and rear yard setback.
120 m away · filed Apr 27, 2023 · Approved
199 Cornelius Pkwy · Minor variance
To construct a new detached dwelling with an attached garage.
190 m away · filed Mar 1, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.