Toronto address · Ward 17, Don Valley North
41 Tollerton Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alteration and covered front porch to an existing two storey single detached dwelling
Applied Sep 9, 2025 · issued Oct 14, 2025 · Permit 25 219946 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior alteration and covered front porch to an existing two storey single detached dwelling
Applied Sep 3, 2025 · issued Oct 14, 2025 · Permit 25 219946 PLB
- Inspections under way
Small residential project · Multiple projects
Proposed interior alteration and covered front porch to an existing two storey single detached dwelling
Applied Sep 3, 2025 · issued Oct 14, 2025 · Permit 25 219946 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
630-648 Finch Avenue East and 73X Banstock Drive
12 storeys · 206 homes · Mixed use
490 m away · Condominium · Under review · filed Nov 10, 2021
Neighbours’ Committee of Adjustment files within 250 m
40 Tollerton Ave · Minor variance
To construct a new detached dwelling with integral garage (The application was deferred at the hearing of 1 Aug 2024)
70 m away · filed Jun 21, 2024 · Approved
2 Sawley Dr · Minor variance
To construct a detached dwelling with an integral garage.
50 m away · filed Mar 29, 2021 · Approved
10 Tollerton Ave · Minor variance
To construct a new two-storey dwelling. The existing dwelling would be demolished.
230 m away · filed Oct 31, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.