Toronto address · Ward 20, Scarborough Southwest
41 Winter Ave
The City of Toronto has 18 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REVISION 2 - for 2 units winthin existing basementHVAC - Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Jul 2, 2026 · issued Jul 23, 2026 · Permit 25 132613 HVA (revision 02)
- Examiner's notice sent
Plumbing
REVISION 2 - for 2 units winthin existing basementPlumbing - Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Jul 2, 2026 · Permit 25 132613 PLB (revision 02)
- Cancelled
Plumbing
Revision 1: for 3 units winthin existing house (to delete unit 4 from the existing garage)Plumbing - Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Mar 27, 2026 · completed Apr 14, 2026 · Permit 25 132613 PLB (revision 01)
- Cancelled
Heating and ventilation
REV01: Proposed revision to delete unit 4 from the existing garageHVAC - Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Mar 20, 2026 · completed Apr 14, 2026 · Permit 25 132613 HVA (revision 01)
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Dec 29, 2025 · issued Feb 6, 2026 · Permit 25 132613 HVA
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Dec 29, 2025 · issued Mar 24, 2026 · Permit 25 132613 PLB
- Cancelled
Small residential project · Interior alterations
Revision 01 - Revision to convert garage into 4th Unit.------------------------------------------------------------------Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Dec 4, 2025 · completed Apr 14, 2026 · 1 home added · Permit 25 132613 BLD (revision 01)
- Inspections under way
Small residential project · Interior alterations
Proposal for interior alterations to convert a SFD into a 3 Unit
Applied Mar 21, 2025 · issued Sep 23, 2025 · 2 homes added · Permit 25 132613 BLD
- Closed
New house · New building
Revision to revise the wet bar to a kitchen in the basementProposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Dec 19, 2019 · issued Feb 3, 2020 · completed Jul 22, 2025 · Permit 18 234195 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Oct 19, 2018 · issued Nov 8, 2018 · completed Jun 2, 2020 · Permit 18 234195 HVA
- Closed
Drains and site services
Drain - Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Oct 1, 2018 · issued Oct 22, 2018 · completed Jun 2, 2020 · Permit 18 234195 DRN
- Closed
Plumbing
Plumbing - Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Oct 1, 2018 · issued Oct 22, 2018 · completed Jun 2, 2020 · Permit 18 234195 PLB
Show 6 more permits
- Closed
New house · New building
Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Oct 1, 2018 · issued Oct 22, 2018 · completed Jul 22, 2025 · 1 home added · Permit 18 234195 BLD
- Closed
Demolition
Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Oct 1, 2018 · issued Oct 22, 2018 · completed Jun 9, 2020 · 1 home removed · Permit 18 234207 DEM
- Cancelled
Heating and ventilation
HVAC - Proposed demolition of existing SFD to be replaced by new 2 storey SFD with finished basement and integrated garage.
Applied May 16, 2016 · completed Apr 23, 2018 · Permit 16 148897 HVA
- Cancelled
Plumbing
Plumbing - Proposed demolition of existing SFD to be replaced by new 2 storey SFD with finished basement and integrated garage.
Applied May 2, 2016 · completed Apr 23, 2018 · Permit 16 148897 PLB
- Cancelled
Demolition
Proposed demolition of existing SFD to be replaced by new 2 storey SFD with finished basement and integrated garage.
Applied May 2, 2016 · completed Apr 23, 2018 · 1 home removed · Permit 16 148888 DEM
- Cancelled
New house · New building
Proposed demolition of existing SFD to be replaced by new 2 storey SFD with finished basement and integrated garage.
Applied May 2, 2016 · completed Apr 23, 2018 · 1 home added · Permit 16 148897 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
80 Huntington Ave · Minor variance
To construct a new two-storey duplex. The existing one-storey dwelling will be demolished.
150 m away · filed Aug 13, 2026 · Hearing scheduled
91 Commonwealth Ave · Minor variance
To permit and maintain the existing detached shed in the rear yard of the lot containing the existing one-storey detached dwelling. Cross-reference previous Minor Variance Application A0280/23SC.
220 m away · filed Jun 24, 2025 · Approved
24 Winter Ave · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement. There will be a total of two dwelling units on the lot.
190 m away · filed Jan 15, 2025 · Approved
60 Huntington Ave · Minor variance
To construct a new three-storey fourplex. Cross reference Consent and Minor Variance Applications A0006/25SC and B0003/25SC being considered jointly.
200 m away · filed Dec 31, 2024 · Refused
60 Huntington Ave · Consent
To obtain consent to sever the existing lot into two new residential lots. Cross reference Minor Variance applications A0006/25SC and A0005/25SC being considered jointly.
200 m away · filed Dec 31, 2024 · Refused
60 Huntington Ave · Minor variance
To construct a new three-storey fourplex. Cross reference Consent and Minor Variance Applications A0006/25SC and B0003/25SC being considered jointly.
200 m away · filed Dec 31, 2024 · Refused
56 Falmouth Ave · Minor variance
To permit and maintain the existing undersized tandem parking space in the side yard of the lot (abutting Brussels Road) containing a proposed Multi-tenant House. NOTE: This item was previously rescheduled from the Committee of Adjustment hearing on December 4, 2024 hearing, and deferred at the Committee of Adjustment hearing on January 16, 2025.
110 m away · filed Oct 16, 2024 · Approved
91 Commonwealth Ave · Minor variance
To construct a single-storey rear yard addition to the existing single-storey detached dwelling.
220 m away · filed Dec 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.