Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

410 Maybank Ave

The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REVISION#3: NEW BASEMENT UNIT, 95 SQ. METER SIZE, FIRE RATED FLOOR & WALLS, INTERCONNECT SMOKE ALARMS, SHUT-OFF DAMPER FOR FURNACE, Proposal for rear addition and underpinning to existing detached single family dwelling.

    Applied Sep 6, 2023 · issued Jun 4, 2025 · 1 home added · Permit 18 178948 BLD (revision 03)

    Revision issued
  • Plumbing

    Plumbing - Proposal for rear addition and underpinning to existing detached single family dwelling.

    Applied May 5, 2022 · issued May 6, 2022 · Permit 18 178948 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for rear addition and underpinning to existing detached single family dwelling.

    Applied May 5, 2022 · issued Jun 10, 2022 · Permit 18 178948 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Rev 2: To Existing permit, reinforcing north foundation wall and minor changes to south wall (adding stair case and side door) and east wall (enlarging basement windows using existing lintel and adding window wells with drain).Proposal for rear addition and underpinning to existing detached single family dwelling.

    Applied Nov 9, 2021 · issued Feb 11, 2022 · Permit 18 178948 BLD (revision 02)

    Revision issued
  • Small residential project · Multiple projects

    Rev 1: revision for the structural drawings Proposal for rear addition and underpinning to existing detached single family dwelling.

    Applied Jul 23, 2020 · issued Aug 6, 2020 · Permit 18 178948 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for rear addition and underpinning to existing detached single family dwelling.

    Applied Jun 15, 2018 · issued Apr 18, 2019 · Permit 18 178948 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 47 Lapp St · Minor variance

    To construct a new laneway suite in the rear yard.

    220 m away · filed May 16, 2023 · Approved

  • 26 Lapp St · Minor variance

    To construct a two-storey rear addition and a new detached garage in the rear yard.

    180 m away · filed May 24, 2022 · Approved

  • 41 Lapp St · Minor variance

    To construct a new detached garage.

    200 m away · filed Mar 8, 2022 · Approved

  • 268 Weston Rd · Minor variance

    To legalize and to maintain the existing one-storey rear additon.

    110 m away · filed Jan 6, 2021 · Approved

  • 258 Weston Rd · Minor variance

    To construct a basement walkout in the front yard and a new front porch.

    110 m away · filed Dec 19, 2019 · Approved

  • 422 Maybank Ave · Minor variance

    To construct a new detached garage.

    40 m away · filed Oct 16, 2019 · Approved

  • 151 Avon Ave · Minor variance

    To construct a detached dwelling with a detached garage in the rear yard.

    250 m away · filed Feb 28, 2019 · Approved

  • 252 Weston Rd · Minor variance

    To construct a two-storey rear addition with a rear second storey balcony.

    100 m away · filed Nov 2, 2018 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.