Toronto address · Ward 4, Parkdale-High Park
411 Willard Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Interior alterations to the basement
Applied Dec 13, 2018 · issued Dec 23, 2018 · completed Feb 13, 2019 · Permit 18 268245 PLB
- Closed
Small residential project · Finishing basements
Interior alterations to the basement
Applied Dec 13, 2018 · issued Dec 18, 2018 · completed May 16, 2019 · Permit 18 268245 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Install Mainline backwater valve and sump pump
Applied Nov 5, 2018 · issued Nov 5, 2018 · completed Nov 8, 2018 · Permit 18 252381 DRN
- Closed
Small residential project · Interior alterations
REV #1-ALTER ROOFPROPOSED INTERIOR ALTERATION FOR S.F.D.(17m2)
Applied Oct 4, 2016 · issued Oct 13, 2016 · completed Mar 14, 2017 · Permit 16 212160 BLD (revision 01)
- Closed
Plumbing
Plumbing - PROPOSED INTERIOR ALTERATION FOR S.F.D.(17m2)
Applied Aug 24, 2016 · issued Sep 19, 2016 · completed Mar 14, 2017 · Permit 16 212160 PLB
- Closed
Small residential project · Interior alterations
PROPOSED INTERIOR ALTERATION FOR S.F.D.(17m2)
Applied Aug 24, 2016 · issued Sep 19, 2016 · completed Mar 14, 2017 · Permit 16 212160 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
453 Durie St · Minor variance
210 m away · filed Aug 14, 2026 · Tentatively scheduled
462 Willard Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with basement extension below and new stairs to grade. Also, to enclose a portion of the front porch (north side) for a new foyer and relocate the front porch stairs (south side). The existing rear one-storey addition will be demolished.
220 m away · filed Aug 25, 2025 · Approved
467 Durie St · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and to enclose a portion of the existing covered front porch into habitable space.
230 m away · filed Jan 3, 2025 · Approved
108 Colbeck St · Minor variance
To enclose the existing verandah into a sunroom and mudroom addition and to construct a new front porch.
240 m away · filed Dec 14, 2021 · Deferred
390 Armadale Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition and a rear ground floor deck.
240 m away · filed Dec 8, 2021 · Approved
88 Ardagh St · Minor variance
To alter the existing two-storey detached dwelling by constructing a new two-storey addition on the west side of the property (fronting Windermere Avenue).
150 m away · filed Nov 22, 2021 · Approved
388 Durie St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by extending the existing rear third storey dormer.
180 m away · filed Sep 29, 2021 · Approved
433 Durie St · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a first storey rear addition, a front covered porch and a rear covered deck. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard of the property.
190 m away · filed Jul 19, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.