Toronto address · Ward 8, Eglinton-Lawrence
417 St Clements Ave
The City of Toronto has 7 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services
Drain - Construction of a one storey rear addition to an existing 3 storey dwelling w/ interior alterations
Applied Jun 15, 2017 · issued Jun 15, 2017 · completed Oct 3, 2019 · Permit 17 130760 DRN
- Closed
Plumbing
Plumbing - Construction of a one storey rear addition to an existing 3 storey dwelling w/ interior alterations
Applied Jun 15, 2017 · issued Jun 15, 2017 · completed Aug 30, 2017 · Permit 17 130760 PLB
- Closed
Heating and ventilation
HVAC - Construction of a one storey rear addition to an existing 3 storey dwelling w/ interior alterations
Applied May 4, 2017 · issued May 10, 2017 · completed Aug 30, 2017 · Permit 17 130760 HVA
- Inspections under way
Small residential project · Multiple projects
Construction of a one storey rear addition to an existing 3 storey dwelling w/ interior alterations
Applied Mar 19, 2017 · issued Apr 5, 2017 · Permit 17 130760 BLD
- Cancelled
Drains and site services · Back water valve (Sewer only)
Install onenew mean line full port Back Water Valve (Sewer only)
Applied Mar 1, 2017 · completed Apr 10, 2017 · Permit 17 123102 DRN
- Cancelled
Small residential project · Multiple projects
Construction of a 1 storey rear addition to an existing 3 storey dwelling
Applied Feb 19, 2017 · completed Mar 9, 2017 · Permit 17 118820 BLD
- Cancelled
Small residential project · Interior alterations
interior alterations to main floor
Applied Aug 18, 2010 · issued Aug 18, 2010 · completed Oct 2, 2025 · Permit 10 241613 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
424 Castlefield Ave · Minor variance
90 m away · filed Sep 16, 2026 · Accepted
87 Hillhurst Blvd · Minor variance
To construct a new detached dwelling with an integral garage. Note: This application was previously deferred at the Committee of Adjustment hearing on October 9, 2025.
200 m away · filed Aug 29, 2025 · Approved
63 Hillhurst Blvd · Minor variance
Proposal to demolish existing dwelling and construct a new two-storey single family detached dwelling.
210 m away · filed May 21, 2025 · Approved
435 Castlefield Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch, rear deck and rear basement walkout. Also proposed is an in-ground swimming pool in the rear yard. Cross-reference previous Minor Variance Application A0040/24NY.
180 m away · filed Aug 28, 2024 · Approved
81 Shields Ave · Consent
To consent to a technical severance of the two residential properties, which merged in title. Proposal to re-establish and restore the original lot line separating 81 and 83 Shields Avenue and to maintain existing vehicular/pedestrian accesses.
230 m away · filed Mar 6, 2024 · Approved
435 Castlefield Ave · Minor variance
Proposal to construct a new dwelling with integrated garage and walkout basement
180 m away · filed Jan 10, 2024 · Refused
372 St Clements Ave · Minor variance
To construct a new dwelling.
210 m away · filed Jan 4, 2024 · Approved on condition
66 Hillhurst Blvd · Minor variance
To permit an extension to the rear portion of the dwelling.
250 m away · filed Oct 23, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.