Toronto address · Ward 4, Parkdale-High Park
417A Annette St
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Installation of HVAC system on second and third floor.
Applied Sep 15, 2004 · issued Sep 21, 2004 · Permit 04 174160 MSA
- Inspections under way
Heating and ventilation · Alter: add on /Ductwork
Convert exist. electric system to gas heating. ( Basement and First Floor Only.)
Applied Apr 19, 2004 · issued May 18, 2004 · Permit 04 125902 MSA
- Inspections under way
Small residential project · Addition(s)
Construct a 1-storey addition at the rear. See C of A decision. Existing and proposed: converted house (3units).
Applied Feb 11, 2004 · issued Feb 11, 2004 · Permit 04 108636 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
146 Gilmour Ave · Minor variance
To construct a new three-storey detached building (containing a pair of semi-detached dwellings), with two front porches with stairs, two front and two rear basement walkouts, two rear ground floor decks with stairs, and two rear third floor balconies. There will be two residential dwelling units on this lot (one unit within each semi-detached dwelling).
230 m away · filed Feb 20, 2026 · Postponed
439 Annette St · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear third storey dormer, a front covered porch with stairs, a front basement walkout with stairs, a rear covered ground floor deck with stairs, and a rear third floor balcony. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the first, second, and third levels).
90 m away · filed May 23, 2025 · Approved
237 Evelyn Ave · Minor variance
To construct a new one-storey detached ancillary building (two-car garage with a washroom), in the rear yard. The existing ancillary building (garage and shed), at the north limits of the site, will be demolished.
210 m away · filed May 22, 2025 · Approved
59 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear two-storey addition with a ground floor deck. The existing rear one-storey addition will be demolished.
140 m away · filed Mar 14, 2025 · Approved
239 Evelyn Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing rear additions to the first, second, and third levels with a rear ground floor deck. The ancillary building (attached garage to the abutting garage at 237 Evelyn Avenue) in the rear yard, will be maintained and unaltered.
220 m away · filed Apr 29, 2024 · Approved
153 Fairview Ave · Minor variance
To construct a new one-storey ancillary building (for habitable and storage space), in the rear yard. The existing ancillary building (detached garage) will be demolished.
180 m away · filed Dec 11, 2023 · Approved
86 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a side (north) third storey dormer addition, a rear ground floor deck, a rear basement walkout staircase and reconstructing/enlarging the front covered porch.
60 m away · filed Sep 29, 2023 · Approved
89 Fairview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor addition with a rear deck and stairs, a third storey addition and to enclose the front porch.
30 m away · filed Dec 7, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.