Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

42 Lesmount Ave

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct second storey addition, front addition and interior renovations to existing Single Family Dwelling

    Applied Dec 12, 2018 · issued Dec 17, 2018 · completed Feb 14, 2020 · Permit 18 213572 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct second storey addition, front addition and interior renovations to existing Single Family Dwelling

    Applied Aug 22, 2018 · issued Sep 20, 2018 · completed May 23, 2019 · Permit 18 213572 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct second storey addition, front addition and interior renovations to existing Single Family Dwelling

    Applied Aug 22, 2018 · issued Sep 20, 2018 · completed May 25, 2019 · Permit 18 213572 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached dwelling by constructing a front one-storey addition with deck, a second storey addition with a rear cantilever, and a rear deck.

    Decision: Approved (hearing Jun 27, 2018)

    Filed Jan 18, 2018 · File A0087/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 322 Cosburn Ave · Minor variance

    To construct a new three-storey (12-unit) apartment building which will span across two lots. This lot (Part 1) will contain six residential dwelling units with front and rear basement walkouts, a front porch with stairs, and a rear third storey balcony. The second storey will be cantilevered on the east side of the building. There will be a total of one short-term and six long-term bicycle parking spaces in the rear yard.

    210 m away · filed Aug 14, 2026 · Hearing scheduled

  • 322 Cosburn Ave · Minor variance

    To construct a new three-storey (12-unit) apartment building which will span across two lots. This lot (Part 2) will contain six residential dwelling units with front and rear basement walkouts, a front porch with stairs, and a rear third storey balcony. The second storey will be cantilevered on the west side of the building. There will be a total of two short term and five long term bicycle parking spaces in the rear yard.

    210 m away · filed Aug 14, 2026 · Hearing scheduled

  • 334 Donlands Ave · Minor variance

    To alter the existing two-and-one-half-storey detached mixed-use building (basement level is considered the first storey) by converting it into fully residential use, with two basement walkouts at the north and south-west corner, and an exterior west side staircase connecting the ground level to the south side second storey terrace. Also, there will be a total of two rear car parking spaces (one accessible parking space), 16 bicycle parking spaces (12 long-term at the basement level and four short-term in the rear yard), and seven exterior bins in the rear yard. There will be a total of 24 re…

    160 m away · filed Aug 13, 2026 · Postponed

  • 301 Cosburn Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage) by constructing a one-storey addition along the west side wall of this building.

    90 m away · filed Jul 21, 2026 · Approved

  • 40 Cadorna Ave · Minor variance

    To legalize and to maintain the side (north) one-storey addition (addition to rear of the existing attached garage and new garage roof) of the existing two-storey detached dwelling, that was constructed without an authorized building permit. Also, to permit and maintain the new front porch roof.

    130 m away · filed Jul 8, 2026 · Postponed

  • 250 Gamble Ave · Minor variance

    To construct a new one-storey detached ancillary building (prefabricated storage shed), in the rear yard of the existing two-storey detached dwelling. The existing rear one-storey detached ancillary building (one-car garage abutting the driveway) will be maintained and unaltered. The existing rear one-storey detached ancillary building (workshop) will be demolished. There is a total of two residential dwelling units on this lot.

    190 m away · filed May 28, 2026 · Approved

  • 12 St Hubert Ave · Minor variance

    To construct a new two-storey detached dwelling (including basement) with an integral garage, a widened driveway, a covered front porch with stairs, a rear first storey deck with stairs, and a rear basement walkout. The existing rear one-storey detached ancillary building (garage) will be demolished.

    250 m away · filed Mar 10, 2026 · Approved

  • 245 Torrens Ave · Minor variance

    To construct a new three-storey semi-detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear ground floor (second level) deck, and a rear basement walkout.

    250 m away · filed Feb 23, 2026 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.