Toronto address · Ward 22, Scarborough-Agincourt
42 Marlbank Rd
The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing
Plumbing - Proposal for rear addition and second suite
Applied Oct 10, 2023 · issued Oct 10, 2023 · Permit 23 150553 PLB (revision 01)
- Revision issued
Small residential project · Multiple projects
Proposal for rear addition and second suite
Applied Oct 10, 2023 · issued Dec 1, 2023 · Permit 23 150553 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for rear addition and second suite
Applied Oct 10, 2023 · issued Oct 18, 2023 · completed May 8, 2025 · Permit 23 150553 HVA (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal for rear addition and second suite
Applied May 25, 2023 · issued Jul 26, 2023 · Permit 23 150553 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for rear addition and second suite
Applied May 25, 2023 · issued Jul 26, 2023 · Permit 23 150553 BLD
- Closed
Heating and ventilation
HVAC - Proposal for rear addition and second suite
Applied May 25, 2023 · issued Jul 26, 2023 · completed May 8, 2025 · Permit 23 150553 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
3459-3471 Sheppard Avenue East
12 storeys · 201 homes · Mixed use
440 m away · Site plan · Under review · filed Mar 31, 2023
- Approved
3421-3445 Sheppard Avenue East
14 storeys · 378 homes · Mixed use
450 m away · Condominium · Approved · filed Apr 2, 2024
Neighbours’ Committee of Adjustment files within 250 m
59 Aragon Ave · Consent
To obtain consent to sever the property into two residential lots. The existing one-storey detached dwelling will be demolished. Cross-reference Minor Variance Applications A0147/24SC and A0148/24SC.
150 m away · filed May 24, 2024 · Approved
59 Aragon Ave · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, rear basement walkout and rear ground floor deck. Cross-reference Consent and Minor Variance Applications B0025/24SC and A0148/24SC.
150 m away · filed May 24, 2024 · Approved
59 Aragon Ave · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, rear basement walkout and rear ground floor deck. Cross-reference Consent and Minor Variance Applications B0025/24SC and A0148/24SC.
150 m away · filed May 24, 2024 · Approved
50 Marlbank Rd · Minor variance
To construct a second floor addition, a new carport and a new enclosed porch. NOTE: This revised Public Notice is being sent out to amend an error for variance 4 and variance 5 .
60 m away · filed Apr 19, 2022 · Approved
42 Aragon Ave · Minor variance
To permit interior alterations to the existing residential building for two secondary suites located in the existing basement. The resulting residential building would have a maximum total of three separate residential units (one dwelling unit and two secondary suites).
120 m away · filed Jun 17, 2020 · Refused
39 Aragon Ave · Minor variance
To construct a new detached dwelling with an integral garage.
60 m away · filed Oct 4, 2016 · Approved
33 Aragon Ave · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family residential dwelling. The existing dwelling will be demolished.
100 m away · filed Apr 21, 2015 · Refused
33 Aragon Ave · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family residential dwelling. The existing dwelling will be demolished.
100 m away · filed Apr 21, 2015 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.