Toronto address · Ward 5, York South-Weston
42 Woolton Cres
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Drains and site services
Drain - Proposed new deck and new addition in the rear yard and interior alterations to convert an existing single family detached dwelling into a 2-unit dwellling.
Applied Sep 20, 2022 · issued Oct 21, 2022 · Permit 21 178413 DRN
- Inspections under way
Heating and ventilation
HVAC - Proposed new front yard parking pad, new deck and new addition in the rear yard and interior alterations to convert an existing single family detached dwelling into a 2-unit dwellling.
Applied Aug 12, 2021 · issued Dec 1, 2021 · Permit 21 178413 HVA
- Inspections under way
Small residential project · Multiple projects
Proposed new deck and new addition in the rear yard and interior alterations to convert an existing single family detached dwelling into a 2-unit dwellling.
Applied Jun 30, 2021 · issued Dec 1, 2021 · 1 home added · Permit 21 178413 BLD
- Inspections under way
Plumbing
Plumbing - Proposed new addition in the rear yard and interior alterations to convert an existing single family detached dwelling into a 2-unit dwellling.
Applied Jun 30, 2021 · issued Dec 1, 2021 · Permit 21 178413 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
27 Woolton Cres · Minor variance
To construct a new dwelling with an attached garage.
90 m away · filed Jun 10, 2026 · Approved
29 Woolton Cres · Minor variance
To construct a new detached dwelling with an attached garage.
80 m away · filed Jun 10, 2026 · Approved
75 Culford Rd · Minor variance
To construct a second storey addition above the existing dwelling, and two-storey rear and south side additions.
170 m away · filed Feb 11, 2026 · Approved
72 Culford Rd · Minor variance
To construct a new detached dwelling and to maintain the existing detached garage.
180 m away · filed Dec 17, 2025 · Approved
28 Woolton Cres · Minor variance
To construct a one-storey addition at southwest corner of the existing dwelling.
120 m away · filed Jul 22, 2025 · Approved
8 Hawkins Dr · Minor variance
To construct a new one-storey rear yard addition.
110 m away · filed Oct 3, 2024 · Approved
34 Woolton Cres · Minor variance
To construct a two-storey west side addition that will include an attached garage and a rear platform, a second storey addition above the existing dwelling and a covered front porch.
70 m away · filed Aug 28, 2024 · Approved
109 Flamborough Dr · Minor variance
To construct a new attached garage along the east side of the dwelling, a second storey addition above the existing dwelling and a two-storey side and rear addition.
230 m away · filed Jan 11, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.