Toronto address · Ward 2, Etobicoke Centre
427 The Kingsway
The City of Toronto has 7 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Examiner's notice sent
Small residential project · Accessory Building(s)
To construct a cabana that is partially enclosed and partially open on existing footings.The cabana is to have a solid flat roof over the entire structure.
Applied Dec 4, 2019 · Permit 19 257139 BLD
- Revision issued
New house · New building
Revision 01: Revision to all floor plan layouts including structural framing, partial revision to elevations including roof line.(Proposal to construct a new 2 storey sfd-detached)Refer to ZZC 13-297014, COA DEcision A 149/13EYK and related DEMO Permit 13-271994
Applied Nov 28, 2014 · issued Jan 21, 2015 · Permit 13 271996 BLD (revision 01)
- Revision issued
Heating and ventilation
HVAC Revision-Radiant heating for all floors.( Proposal to construct a new 2 storey sfd-detached)
Applied Oct 17, 2014 · issued Jan 22, 2015 · Permit 13 271996 HVA (revision 01)
- Closed
Demolition
Proposal to demolish existing 2 storey and construct a new 2 storey sfd-detached
Applied Nov 29, 2013 · issued Dec 13, 2013 · completed Jul 30, 2018 · 1 home removed · Permit 13 271994 DEM
- Inspections under way
Plumbing
Plumbing - Proposal to construct a new 2 storey sfd-detached
Applied Nov 29, 2013 · issued Dec 13, 2013 · Permit 13 271996 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a new 2 storey sfd-detached
Applied Nov 29, 2013 · issued Dec 13, 2013 · Permit 13 271996 HVA
- Inspections under way
New house · New building
Proposal to construct a new 2 storey sfd-detachedRefer to ZZC 13-297014, COA DEcision A 149/13EYK and related DEMO Permit 13-271994
Applied Nov 29, 2013 · issued Dec 16, 2013 · 1 home added · Permit 13 271996 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
9 Elstree Rd · Minor variance
To construct a new detached dwelling with an attached garage.
250 m away · filed Feb 14, 2025 · Approved
10 Elstree Rd · Minor variance
To construct a one-storey front and rear addition.
250 m away · filed Aug 27, 2024 · Approved
413 The Kingsway · Minor variance
To legalize and to maintain an addition at the top of an existing cabana in the rear yard.
210 m away · filed Aug 11, 2023 · Refused
413 The Kingsway · Minor variance
To construct a new detached dwelling with an attached garage and a cabana in the rear yard.
210 m away · filed May 9, 2021 · Approved
22 Cranleigh Crt · Minor variance
To construct a second storey above the existing dwelling, a one-storey rear addition and a new front porch and rear covered platform.
190 m away · filed Dec 17, 2020 · Approved
6 Elstree Rd · Minor variance
To construct a one-storey rear addition and a covered deck in the rear yard.
220 m away · filed Sep 11, 2017 · Approved
423 The Kingsway · Minor variance
To construct a new detached dwelling with an attached garage and an accessory structure (cabana) in the rear yard. A previous Committee of Adjustment application (A0806/16EYK) approved variances relating to side yard setbacks, building depth, building length, building height, soffit height and exterior main wall height.
60 m away · filed Apr 7, 2017 · Approved
425 The Kingsway · Minor variance
To construct a loggia that includes a covered dining area at the rear of the dwelling and a covered hot tub area at the rear of the dwelling.
20 m away · filed Dec 21, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.