Toronto address · Ward 4, Parkdale-High Park
43 Alhambra Ave
The City of Toronto has 7 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Underpining and finishing basement
Applied Feb 8, 2017 · issued Feb 8, 2017 · Permit 17 113726 PLB
- Inspections under way
Small residential project · Multiple projects
Underpining and finishing basement
Applied Feb 6, 2017 · issued Feb 8, 2017 · Permit 17 113726 BLD
- Revision issued
Small residential project · Multiple projects
REV #1- add 3rd floor dormer, new door to 3rd flr deckProposal for a 2 storey rear addition and interior alterations to existing detached single family dwelling.
Applied Apr 16, 2014 · issued May 1, 2014 · Permit 14 107889 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal for a 2 storey rear addition and interior alterations to existing detached single family dwelling.
Applied Mar 20, 2014 · issued Mar 21, 2014 · Permit 14 107889 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for a 2 storey rear addition and interior alterations to existing detached single family dwelling.
Applied Jan 22, 2014 · issued Feb 13, 2014 · Permit 14 107889 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for a 2 storey rear addition and interior alterations to existing detached single family dwelling.
Applied Jan 22, 2014 · issued Feb 13, 2014 · Permit 14 107889 PLB
- Inspections under way
Drains and site services
Drain - Proposal for a 2 storey rear addition and interior alterations to existing detached single family dwelling.
Applied Jan 22, 2014 · issued Feb 13, 2014 · Permit 14 107889 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
2252-2290 Dundas Street West and 105 Ritchie Avenue
2,312 homes · Mixed use
100 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
27 storeys · Mixed use
140 m away · Site plan · Under review · filed Apr 26, 2022
- Approved
33 storeys · 377 homes · Residential
350 m away · Rezoning · Approved · filed Dec 24, 2025
- Under review
42 storeys · 56 homes · Not stated in the file
360 m away · Site plan · Under review · filed Jun 27, 2025
- Approved
18 storeys · 262 homes · Residential
380 m away · Site plan · Approved · filed Oct 15, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
430 m away · Site plan · Under review · filed Aug 20, 2021
Neighbours’ Committee of Adjustment files within 250 m
2280 Dundas St W · Minor variance
Addition and change to the design of the transformer vault, as per Toronto Hydro's request.
220 m away · filed Sep 18, 2026 · Postponed
52 Indian Trl · Consent
To obtain consent to create a new easement/right-of-way and to maintain existing easements/rights-of-way.
240 m away · filed Aug 25, 2026 · Postponed
12 Alhambra Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front enclosed porch with stairs, and a rear ground floor deck with stairs. Also, to replace the existing one-storey ancillary building (detached garage) as well as the shed, with a parking pad. In addition, the existing rear second storey sunroom and rear third storey deck will be removed.
120 m away · filed Jun 18, 2025 · Approved
52 Boustead Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear partial third storey addition (dormer), and a rear second storey addition with a rear balcony (above the existing rear one-storey portion of the dwelling). Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
230 m away · filed Dec 18, 2024 · Approved
32 Boustead Ave · Minor variance
To construct a new two-storey detached dwelling with a front covered porch and a rear ground floor deck. Also, to construct a new two-storey detached ancillary building (to contain one parking space and one garden suite (which will occupy both levels)) with a second storey east side terrace. All existing structures to be demolished.
190 m away · filed Dec 9, 2024 · Approved
1555 Bloor St W · Minor variance
To alter the existing four-storey semi-detached dwelling (as approved by the Toronto Local Appeal Body, under Case File Numbers 18 176857 S45 14 TLAB, 18 176860 S45 14 TLAB, and 18 176864 S45 14 TLAB) by converting the existing basement artist studio into habitable space (one live-work unit). The existing five residential dwelling units will be maintained and unaltered. There will be a total of six residential units on this lot.
90 m away · filed Jul 31, 2024 · Approved
1557 Bloor St W · Minor variance
To alter the existing four-storey detached dwelling (as approved by the Toronto Local Appel Body, under Case File Numbers 18 176857 S45 14 TLAB, 18 176860 S45 14 TLAB, and 18 176864 S45 14 TLAB) by converting the existing basement artist studio into habitable space (one live-work unit). The existing five residential dwelling units will be maintained and unaltered. There will be a total of six residential units on this lot.
100 m away · filed Jul 29, 2024 · Approved
52 Indian Trl · Minor variance
To maintain a one-storey ancillary building (detached garage in the rear yard), which is currently under construction. The existing two-and-one-half-storey detached dwelling (triplex) will be maintained and unaltered.
240 m away · filed Jun 19, 2024 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.