Toronto address · Ward 9, Davenport
43 Turnberry Ave
The City of Toronto has 9 building permits since 2017 (4 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposal for two storey rear addition and interior alterations to existing 1 storey SFD, new covered front porch, covered rear deck
Applied Nov 27, 2025 · issued Feb 17, 2026 · Permit 25 253877 HVA
- Permit issued
Drains and site services
Drain - Proposal for 2 storey Rear addition and interior alterations to existing 1 storey SFD, new covered front porch, covered rear deck
Applied Nov 14, 2025 · issued Feb 17, 2026 · Permit 25 253877 DRN
- Permit issued
Plumbing
Plumbing - Proposal for 2 storey Rear addition and interior alterations to existing 1 storey SFD, new covered front porch, covered rear deck
Applied Nov 14, 2025 · issued Feb 17, 2026 · Permit 25 253877 PLB
- Inspections under way
Small residential project · Addition(s)
Proposal for two storey rear addition and interior alterations to existing 1 storey SFD, new covered front porch, covered rear deck
Applied Nov 14, 2025 · issued Feb 17, 2026 · Permit 25 253877 BLD
- Cancelled
New house · New building
REV 01: Revision Permit to issued permit # 20-221509-BLD-00 for building permit and plumbing.Revision to rear stair and porch, front porch width, 2nd floor layout, additional notes/engineering for walls and beams, change to elevations / different roof. R/I bathroom in basement to be added.
Applied Dec 6, 2022 · completed Nov 18, 2025 · Permit 20 221509 BLD (revision 01)
- Closed
Drains and site services
Drain - Construct a three storey dwelling
Applied Nov 23, 2020 · issued Feb 8, 2021 · completed Jun 9, 2026 · Permit 20 221509 DRN
- Closed
Plumbing
Plumbing - Construct a three storey dwelling
Applied Nov 23, 2020 · issued Feb 8, 2021 · completed Jun 9, 2026 · Permit 20 221509 PLB
- Closed
New house · New building
Construct a three storey dwelling - detached house, single family dwelling.
Applied Nov 23, 2020 · issued Feb 8, 2021 · completed Jun 9, 2026 · 1 home added · Permit 20 221509 BLD
- Closed
Demolition
Demolish existing two storey dwelling
Applied Nov 23, 2020 · issued Feb 8, 2021 · completed Apr 25, 2023 · 1 home removed · Permit 20 221535 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To legalize and to maintain the reconstruction of a complete second storey addition, and the construction of a rear two-storey addition (including a basement extension below), and front and rear covered porches with stairs, which were all constructed beyond an authorized building permit.
Decision: Approved (hearing Oct 15, 2025)
Filed Feb 21, 2025 · File A0165/25TEY
- Closed
Minor variance · New R building
To construct a three-storey detached dwelling.
Decision: Approved (hearing May 30, 2019)
Filed Jan 31, 2019 · File A0057/19EYK (TEY)
What’s planned nearby
Development sites within 500 m
- Under review
119-200 Benny Stark Street and 116 Turnberry Avenue
24 storeys · 547 homes · Mixed use
320 m away · Site plan · Under review · filed Apr 29, 2022
- Under review
- Under review
- Under review
39 storeys · 1,951 homes · Mixed use
420 m away · Site plan · Under review · filed Apr 25, 2022
Neighbours’ Committee of Adjustment files within 250 m
249 Silverthorn Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, new front and rear covered verandahs with stairs, front and rear basement walkouts, and front and rear second storey balconies. Also, to construct a new two-storey detached ancillary building (containing one garden suite which will occupy both levels), in the rear yard of the property. There will be a total of four residential dwelling units on this lot (three dwelling units within the main house and one dwelling unit within the ancillary building).
210 m away · filed Jul 10, 2024 · Approved
581 Old Weston Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition over the existing rear basement walkout. There will be one primary unit and one secondary suite within this dwelling.
70 m away · filed Sep 1, 2023 · Approved
105 Turnberry Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.
200 m away · filed Nov 17, 2022 · Approved
35 Turnberry Ave · Minor variance
To construct a new rear detached garage.
30 m away · filed Aug 31, 2021 · Approved
633 Old Weston Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing: a rear two-storey addition; a rear walk-out basement; and rear decks on the ground floor and second storey. Also, to convert the existing attached garage into storage area.
130 m away · filed Aug 6, 2021 · Approved
1 Algarve Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.
160 m away · filed May 8, 2021 · Approved
3 Algarve Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.
160 m away · filed May 8, 2021 · Approved
134 Rockwell Ave · Minor variance
To construct a new three-storey detached dwelling on the conveyed lot known as Part 3, created through consent application B0038/21TEY. The new dwelling will have a front second and third storey balcony, rear ground floor deck and front integral garage.
190 m away · filed Apr 3, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.