Toronto address · Ward 9, Davenport
431 Margueretta St
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Walkout, underpinning, basement interior alterations to existing single family dwelling.
Applied Nov 23, 2011 · issued Nov 25, 2011 · Permit 11 314804 BLD
- Inspections under way
Plumbing
Plumbing - WALKOUT, UNDERPINNING, BASEMENT INTERIOR ALTERATIONS TO EXISTING SINGLE FAMILY DWELLING.
Applied Nov 23, 2011 · issued Nov 25, 2011 · Permit 11 314804 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
320 m away · Rezoning · Approved · filed Feb 9, 2026
- Under review
1141 Bloor Street West, 90 Croatia Street and 980 Dufferin Street
22 storeys · 264 homes · Mixed use
390 m away · Site plan · Under review · filed Feb 27, 2026
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
460 m away · Site plan · Under review · filed Aug 9, 2022
Neighbours’ Committee of Adjustment files within 250 m
57 Emerson Ave · Minor variance
To construct a new one-storey ancillary building (sitting area/workshop and sauna), with a covered porch (located at the southwest corner of the building), in the rear yard. The existing one-storey ancillary detached building (garage) will be demolished.
100 m away · filed Jun 3, 2026 · Approved
111 Emerson Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front ground floor deck with stairs and privacy screening (located beyond the existing front enclosed porch).
140 m away · filed Feb 24, 2026 · Approved
750 Brock Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition.
130 m away · filed Sep 12, 2025 · Approved
763 Lansdowne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear deck, a rear one-storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (detached garage with a workshop and storage space above) in the rear yard, abutting the laneway.
250 m away · filed Aug 26, 2025 · Approved
428 Margueretta St · Minor variance
To convert the existing two-and-one-half-storey detached dwelling into a fourplex by constructing a front basement walkout, and new rear ground floor stairs (the existing rear ground floor deck and stairs will be demolished). There will be a total of five dwelling units on this lot (four units within the main dwelling, and one dwelling unit within the rear detached ancillary building (garden suite, approved under an authorized building permit)).
40 m away · filed Sep 25, 2024 · Approved
41 Wallace Ave · Minor variance
To convert the existing three-storey detached dwelling into a fourplex by constructing a rear three-storey addition, front and rear third storey balconies, a rear second storey balcony, and a rear ground floor deck. The existing front second storey balcony will be maintained. There will be a total of four residential dwelling units on this lot.
220 m away · filed Jun 3, 2024 · Approved
568 St Clarens Ave · Minor variance
To construct a two-storey ancillary building (detached garage with storage space above) in the rear yard, abutting the laneway.
240 m away · filed May 3, 2024 · Approved
119 Pauline Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished.
220 m away · filed Feb 15, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.