Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

447 Concord Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Rev 2 - Revision to garage heightRev 1 - Proposed revision to concrete foundation.Proposal for a 1 storey rear addition to existing single family dwelling. Scope of work also includes a detached garage.

    Applied Oct 9, 2018 · issued Jun 11, 2020 · completed Apr 20, 2021 · Permit 18 102208 BLD (revision 02)

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a back water valve

    Applied Aug 29, 2018 · issued Aug 29, 2018 · completed Sep 7, 2018 · Permit 18 216973 DRN

    Closed
  • Small residential project · Multiple projects

    Rev 1 - Proposed revision to concrete foundation.Proposal for a 1 storey rear addition to existing single family dwelling. Scope of work also includes a detached garage.

    Applied May 2, 2018 · issued May 8, 2018 · completed Apr 20, 2021 · Permit 18 102208 BLD (revision 01)

    Closed
  • Small residential project · Multiple projects

    Proposal for a 1 storey rear addition to existing single family dwelling. Scope of work also includes a detached garage.

    Applied Jan 8, 2018 · issued Mar 19, 2018 · completed Apr 20, 2021 · Permit 18 102208 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a rear detached garage.

    Decision: Approved (hearing Jan 23, 2019)

    Filed Nov 2, 2018 · File A1031/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 157 Hallam Street

    4 homes · Residential

    350 m away · Condominium · Approved · filed Jun 18, 2025

    Approved
  • 798 Dovercourt Road

    Residential

    380 m away · Condominium · Approved · filed Nov 14, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 877 Ossington Ave · Minor variance

    To construct a new three-storey building (sixplex) with front and rear below-grade and at-grade patios, front balconies on all storeys (first storey to third storey), rear first and second storey balconies as well as a side (south) uncovered ramp leading to the platform of the recessed portion of the building which provides six separate unit side entrances. Also to construct a rear ancillary structure (a storage enclosure for waste and 5 stacked bicycle parking spaces). A total of six residential dwelling units will be located on this lot.

    130 m away · filed Dec 2, 2024 · Approved

  • 822 Ossington Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage, abutting Pasquino Lane), in the rear yard of the existing two-and-one-half-storey detached dwelling (triplex), by constructing a complete second storey addition (for the purpose of one laneway suite on the second level and maintaining one parking space on the ground level). There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    220 m away · filed Oct 25, 2024 · Approved

  • 431 Concord Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage abutting the laneway) by constructing a second storey addition (to contain one laneway suite that will occupy both levels). There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    50 m away · filed Sep 20, 2024 · Refused

  • 880 Ossington Ave · Minor variance

    To convert the existing two-storey detached dwelling into a triplex dwelling by constructing a front basement walkout, side (south) and rear two-storey additions, a complete third storey addition, and rear balconies on the first, second, and third storeys. Also, to demolish the existing rear detached garage and construct a new two-storey ancillary building (containing a laneway suite), in the rear yard, abutting the laneway. There will be a total of four residential dwelling units on this lot (three dwelling units within the main triplex building and one dwelling unit located in the laneway s…

    80 m away · filed Aug 14, 2024 · Approved

  • 301 Delaware Ave · Minor variance

    To permit the existing rear third storey addition, which was constructed without an authorized building permit.

    150 m away · filed May 2, 2024 · Approved

  • 386 Concord Ave · Minor variance

    To construct a new two-storey laneway suite.

    130 m away · filed Jan 26, 2024 · Approved

  • 373 Concord Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck. The rear two-storey addition will replace the existing rear one-storey addition and the rear second storey addition will be cantilevered on the south side of the altered dwelling.

    200 m away · filed Jan 23, 2024 · Approved

  • 297 Delaware Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling (currently under construction) by converting it into a duplex dwelling (for two residential dwelling units). Also, to construct a rear third storey addition (to convert a portion of the rear third storey terrace into habitable space) and a front basement walkout entrance for the dwelling unit within the basement.

    150 m away · filed Jul 28, 2023 · Refused

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.